Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
FFIII Houston SNF Tenant LLC
HOUSTON, TX · 92 certified beds · Last Life Safety survey August 28, 2025
CMS Certification Number 676111 · first certified August 2006
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Other
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within TX
8 citations — more than 52% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2026. This facility’s last Life Safety survey was August 2025. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,905 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about FFIII Houston SNF Tenant LLC
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 8 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 1, 2023 | 5 |
| July 25, 2024 | 1 |
| August 28, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | 2 | 2024-07-25 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2023-06-01 |
| K-0929 | Ensure precautions for handling oxygen cylinders and equipment are correctly followed. | 1 | 2025-08-28 |
| K-0900 | Meet Health Care Facilities Code mechanical requirements. | 1 | 2023-06-01 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2023-06-01 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2023-06-01 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2025-08-28 |
What the citations cover
- Smoke Deficiencies 5
- Miscellaneous Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Miscellaneous Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
August 28, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (September 8, 2025) |
| K-0929 | Ensure precautions for handling oxygen cylinders and equipment are correctly followed. | Deficient, Provider has date of correction (September 8, 2025) |
July 25, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (July 30, 2024) |
June 1, 2023 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (July 14, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 14, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (July 14, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (July 14, 2023) |
| K-0900 | Meet Health Care Facilities Code mechanical requirements. | Deficient, Provider has date of correction (July 14, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.