Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
LLANO NURSING AND REHABILITATION CENTER
LLANO, TX · 96 certified beds · Last Life Safety survey September 4, 2025
CMS Certification Number 675076 · first certified August 1992
Ownership
Operated by SLP OPERATIONS · For profit - Corporation
- Ownership changed April 1, 2017 (change of ownership)from SLP LLANO LLC
Position within TX
11 citations — more than 69% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2026. This facility’s last Life Safety survey was September 2025. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,905 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about LLANO NURSING AND REHABILITATION CENTER
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 11 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0880 Provide and implement an infection prevention and control program.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 28, 2023 | 7 |
| August 8, 2024 | 3 |
| September 4, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2024-08-08 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2024-08-08 |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2023-06-28 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2023-06-28 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2023-06-28 |
| E-0041 | Implement emergency and standby power systems. | 1 | 2024-08-08 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2023-06-28 |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | 1 | 2025-09-04 |
What the citations cover
- Smoke Deficiencies 6
- Miscellaneous Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Emergency Preparedness Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Miscellaneous Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 4, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (December 19, 2025) |
August 8, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (March 26, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 10, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 10, 2025) |
June 28, 2023 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (March 30, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (April 2, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 2, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (April 5, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (March 30, 2024) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (March 30, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 30, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.