Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
BUCKNER WESTMINSTER PLACE
LONGVIEW, TX · 20 certified beds · Last Life Safety survey July 15, 2026
CMS Certification Number 676167 · first certified January 2008
Also on this campus
The same campus holds a state-licensed assisted living facility, with its own state record on the Assisted Living Index: Buckner Westminster Place (2201 Horseshoe Ln). Matched by the telephone number the two records share. The records are separate and are never added together.
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within TX
6 citations — more than 34% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys on file averaged 1.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens August 2027 — about 9 months from now. This facility’s last Life Safety survey was July 2026. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,923 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about BUCKNER WESTMINSTER PLACE
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 15, 2024 | 0 |
| June 4, 2025 | 3 |
| July 15, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 2 | 2026-07-15 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2026-07-15 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2025-06-04 |
| K-0344 | Have an alternate power supply for its alarm system. | 1 | 2025-06-04 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2026-07-15 |
What the citations cover
- Smoke Deficiencies 6
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 15, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 5, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (July 15, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (July 15, 2026) |
June 4, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 10, 2025) |
| K-0344 | Have an alternate power supply for its alarm system. | Deficient, Provider has date of correction (June 12, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 12, 2025) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.