Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
MESQUITE TREE NURSING CENTER
MESQUITE, TX · 143 certified beds · Last Life Safety survey March 5, 2026
CMS Certification Number 675033 · first certified March 1992
Ownership
Operated by ADVANCED HEALTHCARE SOLUTIONS · Government - Hospital district
- Ownership changed March 1, 2024 (change of ownership)from MESQUITE NH SNF LLC
Position within TX
16 citations — more than 88% of the 1,177 certified nursing homes in TX. Compared within TX rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens April 2027 — about 6 months from now. This facility’s last Life Safety survey was March 2026. Facilities in TX are typically surveyed 13–14 months after the last one (median 14), measured over 1,905 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about MESQUITE TREE NURSING CENTER
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 16 Life Safety citations above. The Physical Environment Index
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
- F-0880 Provide and implement an infection prevention and control program.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
How that compares
Compared with the median facility in TX, and nationally. Surveyors differ markedly between states, so the TX figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 16 |
| Median facility in TX | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 26, 2023 | 3 |
| December 20, 2024 | 8 |
| March 5, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2026-03-05 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2026-03-05 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2026-03-05 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2023-10-26 |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | 1 | 2024-12-20 |
| K-0161 | Use approved construction type or materials. | 1 | 2023-10-26 |
| K-0929 | Ensure precautions for handling oxygen cylinders and equipment are correctly followed. | 1 | 2024-12-20 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2024-12-20 |
What the citations cover
- Smoke Deficiencies 11
- Egress Deficiencies 3
- Construction Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 11 |
| Egress Deficiencies | 3 |
| Construction Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 5, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (April 18, 2026) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 18, 2026) |
| K-0352 | Properly install and monitor supervisory attachments on automatic sprinkler systems. | Deficient, Provider has date of correction (April 18, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 18, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 18, 2026) |
December 20, 2024 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (February 1, 2025) |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (February 1, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (February 1, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (February 1, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 1, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (February 1, 2025) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (February 1, 2025) |
| K-0929 | Ensure precautions for handling oxygen cylinders and equipment are correctly followed. | Deficient, Provider has date of correction (February 1, 2025) |
October 26, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (December 10, 2023) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (December 10, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 10, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.