Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Fairfield Village Rehabilitation

Layton, UT · 40 certified beds · Last Life Safety survey May 28, 2026

CMS Certification Number 465174 · first certified December 2010

Ownership

Independently operated (no chain recorded by CMS) · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

5
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
0
Inspection & testing records
Of the citations on file

Position within UT

5 citations — more than 54% of the 97 certified nursing homes in UT. Compared within UT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 2 citations; the earlier surveys in the window averaged 1.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens December 2027 — about 15 months from now. This facility’s last Life Safety survey was May 2026. Facilities in UT are typically surveyed 19–24 months after the last one (median 21), measured over 88 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Fairfield Village Rehabilitation

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 5 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in UT, and nationally. Surveyors differ markedly between states, so the UT figure is the meaningful one.

This facility5UT median3National median11
Citations on file over three years, compared
MeasureCitations
This facility5
Median facility in UT3
Median facility nationally11

Survey history

Citations at each Life Safety survey
22023-0512025-0122026-05
Citations at each Life Safety survey
Survey dateCitations
May 31, 20232
January 8, 20251
May 28, 20262

Most-cited tags

Most-cited tags at this facility
K-03212K-09211K-07811K-02111
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.22026-05-28
K-0921Ensure that testing and maintenance of electrical equipment is performed.12025-01-08
K-0781Have restrictions on the use of portable space heaters.12026-05-28
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12023-05-31

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 2
  • Egress Deficiencies 1
  • Miscellaneous Deficiencies 1
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies2
Egress Deficiencies1
Miscellaneous Deficiencies1
Gas, Vacuum, and Electrical Systems Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

May 28, 2026 — 2 citations

Citations issued on May 28, 2026
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (June 19, 2026)
K-0781Have restrictions on the use of portable space heaters.Deficient, Provider has date of correction (June 19, 2026)

January 8, 2025 — 1 citation

Citations issued on January 8, 2025
TagWhat the surveyor checksStatus
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (February 19, 2025)

May 31, 2023 — 2 citations

Citations issued on May 31, 2023
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (June 15, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (June 15, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.