Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Aspen Ridge Transitional Rehab

Murray, UT · 38 certified beds · Last Life Safety survey February 26, 2026

CMS Certification Number 465159 · first certified October 2004

Ownership

Operated by ADVANCED HEALTH CARE · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

7
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
4
Inspection & testing records
Of the citations on file

Position within UT

7 citations — more than 65% of the 97 certified nursing homes in UT. Compared within UT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 1 citation; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens October 2027 — about 12 months from now. This facility’s last Life Safety survey was February 2026. Facilities in UT are typically surveyed 19–24 months after the last one (median 21), measured over 88 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Aspen Ridge Transitional Rehab

One email when it happens. No account; stop it any time with one click.

Which alerts

How that compares

Citations on file over three years

Compared with the median facility in UT, and nationally. Surveyors differ markedly between states, so the UT figure is the meaningful one.

This facility7UT median3National median11
Citations on file over three years, compared
MeasureCitations
This facility7
Median facility in UT3
Median facility nationally11

Survey history

Citations at each Life Safety survey
42023-0622025-0112026-02
Citations at each Life Safety survey
Survey dateCitations
June 1, 20234
January 16, 20252
February 26, 20261

Most-cited tags

Most-cited tags at this facility
K-03211K-05111K-09181K-03741K-07811K-03451K-09231
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12023-06-01
K-0511Have properly installed electrical wiring and gas equipment.12023-06-01
K-0918Have generator or other power source capable of supplying service within 10 seconds.12023-06-01
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12025-01-16
K-0781Have restrictions on the use of portable space heaters.12026-02-26
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12023-06-01
K-0923Have proper medical gas storage and administration areas.12025-01-16

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 3
  • Gas, Vacuum, and Electrical Systems Deficiencies 2
  • Miscellaneous Deficiencies 1
  • Services Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies3
Gas, Vacuum, and Electrical Systems Deficiencies2
Miscellaneous Deficiencies1
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

February 26, 2026 — 1 citation

Citations issued on February 26, 2026
TagWhat the surveyor checksStatus
K-0781Have restrictions on the use of portable space heaters.Deficient, Provider has date of correction (March 4, 2026)

January 16, 2025 — 2 citations

Citations issued on January 16, 2025
TagWhat the surveyor checksStatus
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (January 31, 2025)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (January 31, 2025)

June 1, 2023 — 4 citations

Citations issued on June 1, 2023
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 30, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (May 31, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (May 31, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (May 30, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.