Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

HIGHLAND RIDGE REHAB CENTER

DUBLIN, VA · 132 certified beds · Last Life Safety survey February 26, 2026

CMS Certification Number 495333 · first certified September 1998

Ownership

Operated by HILL VALLEY HEALTHCARE · For profit - Corporation

  • Ownership changed July 1, 2019 (change of ownership)from HIGHLAND RIDGE REHAB CENTER LLC
20
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
5
Tags cited more than once
Across separate surveys
13
Inspection & testing records
Of the citations on file

Position within VA

20 citations — more than 84% of the 289 certified nursing homes in VA. Compared within VA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 1 citation; the earlier surveys in the window averaged 9.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens September 2028 — about 24 months from now. This facility’s last Life Safety survey was February 2026. Facilities in VA are typically surveyed 31–43 months after the last one (median 37), measured over 125 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about HIGHLAND RIDGE REHAB CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 20 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.

How that compares

Citations on file over three years

Compared with the median facility in VA, and nationally. Surveyors differ markedly between states, so the VA figure is the meaningful one.

This facility20VA median10National median11
Citations on file over three years, compared
MeasureCitations
This facility20
Median facility in VA10
Median facility nationally11

Survey history

Citations at each Life Safety survey
92021-10102023-0412026-02
Citations at each Life Safety survey
Survey dateCitations
October 8, 20219
April 26, 202310
February 26, 20261

Most-cited tags

Most-cited tags at this facility
K-03533K-07612K-03252K-03632K-05112K-05211K-07121K-03451
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.32026-02-26
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.22023-04-26
K-0325Have properly installed hallway dispensers for alcohol-based hand rub.22023-04-26
K-0363Install corridor and hallway doors that block smoke.22023-04-26
K-0511Have properly installed electrical wiring and gas equipment.22023-04-26
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.12021-10-08
K-0712Have simulated fire drills held at unexpected times.12023-04-26
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12021-10-08

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 10
  • Miscellaneous Deficiencies 3
  • Services Deficiencies 3
  • Egress Deficiencies 2
  • Other 2
Citations by CMS category
CategoryCitations
Smoke Deficiencies10
Miscellaneous Deficiencies3
Services Deficiencies3
Egress Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies2

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

February 26, 2026 — 1 citation

Citations issued on February 26, 2026
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (April 7, 2026)

April 26, 2023 — 10 citations

Citations issued on April 26, 2023
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Waiver has been granted (October 3, 2023)
K-0325Have properly installed hallway dispensers for alcohol-based hand rub.Deficient, Provider has date of correction (June 20, 2023)
K-0331Construct fire resistant interior walls.Deficient, Provider has date of correction (June 20, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (October 3, 2023)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (June 20, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (October 3, 2023)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (October 3, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (June 20, 2023)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Waiver has been granted (October 3, 2023)
K-0916Have a battery powered remote alarm panel in a location accessible by operating personnel.Deficient, Provider has date of correction (June 20, 2023)

October 8, 2021 — 9 citations

Citations issued on October 8, 2021
TagWhat the surveyor checksStatus
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (May 16, 2022)
K-0325Have properly installed hallway dispensers for alcohol-based hand rub.Deficient, Provider has date of correction (November 30, 2021)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (November 30, 2021)
K-0353Inspect, test, and maintain automatic sprinkler systems.Waiver has been granted (May 16, 2022)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (November 30, 2021)
K-0511Have properly installed electrical wiring and gas equipment.Waiver has been granted (May 16, 2022)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (November 30, 2021)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Waiver has been granted (May 16, 2022)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (November 30, 2021)