Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

THE LAURELS OF WILLOW CREEK

MIDLOTHIAN, VA · 120 certified beds · Last Life Safety survey September 13, 2023

CMS Certification Number 495257 · first certified September 1991

Ownership

Operated by CIENA HEALTHCARE/LAUREL HEALTH CARE · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

17
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
5
Inspection & testing records
Of the citations on file

Position within VA

17 citations — more than 74% of the 289 certified nursing homes in VA. Compared within VA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: April 2026 to April 2027. This facility’s last Life Safety survey was September 2023. Facilities in VA are typically surveyed 31–43 months after the last one (median 37), measured over 125 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about THE LAURELS OF WILLOW CREEK

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 17 Life Safety citations above. The Physical Environment Index

  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in VA, and nationally. Surveyors differ markedly between states, so the VA figure is the meaningful one.

This facility17VA median10National median11
Citations on file over three years, compared
MeasureCitations
This facility17
Median facility in VA10
Median facility nationally11

Survey history

Citations at each Life Safety survey
102019-0322022-0352023-09
Citations at each Life Safety survey
Survey dateCitations
March 14, 201910
March 24, 20222
September 13, 20235

Most-cited tags

Most-cited tags at this facility
K-03741K-02231K-03721K-09161K-07111K-01611K-03211K-03531
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12019-03-14
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.12023-09-13
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12019-03-14
K-0916Have a battery powered remote alarm panel in a location accessible by operating personnel.12022-03-24
K-0711Provide a written emergency evacuation plan.12019-03-14
K-0161Use approved construction type or materials.12019-03-14
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12019-03-14
K-0353Inspect, test, and maintain automatic sprinkler systems.12023-09-13

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 7
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Egress Deficiencies 3
  • Miscellaneous Deficiencies 1
  • Other 2
Citations by CMS category
CategoryCitations
Smoke Deficiencies7
Gas, Vacuum, and Electrical Systems Deficiencies4
Egress Deficiencies3
Miscellaneous Deficiencies1
Construction Deficiencies1
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

September 13, 2023 — 5 citations

Citations issued on September 13, 2023
TagWhat the surveyor checksStatus
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (November 8, 2023)
K-0300Meet other general requirements that are deficient.Deficient, Provider has date of correction (November 8, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (November 8, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (November 8, 2023)
K-0371Have properly sized and located compartments to protect residents from smoke.Deficient, Provider has date of correction (November 8, 2023)

March 24, 2022 — 2 citations

Citations issued on March 24, 2022
TagWhat the surveyor checksStatus
K-0915Have proper power supply for life support equipment.Deficient, Provider has date of correction (May 10, 2022)
K-0916Have a battery powered remote alarm panel in a location accessible by operating personnel.Deficient, Provider has date of correction (May 10, 2022)

March 14, 2019 — 10 citations

Citations issued on March 14, 2019
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (May 22, 2019)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (May 22, 2019)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 22, 2019)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (May 22, 2019)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (May 22, 2019)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (May 22, 2019)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (May 22, 2019)
K-0711Provide a written emergency evacuation plan.Deficient, Provider has date of correction (May 22, 2019)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (May 22, 2019)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (May 22, 2019)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.