Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Atlantic View Post Acute

NEWPORT NEWS, VA · 154 certified beds · Last Life Safety survey December 1, 2022

CMS Certification Number 495286 · first certified January 1994

Ownership

Operated by MARQUIS HEALTH SERVICES · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

9
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
4
Inspection & testing records
Of the citations on file

Position within VA

9 citations — more than 41% of the 289 certified nursing homes in VA. Compared within VA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Past the typical window (July 2025 to July 2026). Most VA facilities have been surveyed by November 2026. This facility’s last Life Safety survey was December 2022. Facilities in VA are typically surveyed 31–43 months after the last one (median 37), measured over 125 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Atlantic View Post Acute

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 9 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index

  • F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
  • F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in VA, and nationally. Surveyors differ markedly between states, so the VA figure is the meaningful one.

This facility9VA median10National median11
Citations on file over three years, compared
MeasureCitations
This facility9
Median facility in VA10
Median facility nationally11

Survey history

Citations at each Life Safety survey
02017-0962019-0432022-12
Citations at each Life Safety survey
Survey dateCitations
September 14, 20170
April 18, 20196
December 1, 20223

Most-cited tags

Most-cited tags at this facility
K-03532K-09211K-01001K-02111K-03241E-00151K-02231K-03451
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.22022-12-01
K-0921Ensure that testing and maintenance of electrical equipment is performed.12019-04-18
K-0100Meet other general requirements.12019-04-18
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12019-04-18
K-0324Provide properly protected cooking facilities.12022-12-01
E-0015Address subsistence needs for staff and patients.12022-12-01
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.12019-04-18
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12019-04-18

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 4
  • Egress Deficiencies 2
  • Gas, Vacuum, and Electrical Systems Deficiencies 1
  • Emergency Preparedness Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies4
Egress Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies1
Emergency Preparedness Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

December 1, 2022 — 3 citations

Citations issued on December 1, 2022
TagWhat the surveyor checksStatus
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (January 16, 2023)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (January 21, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 21, 2023)

April 18, 2019 — 6 citations

Citations issued on April 18, 2019
TagWhat the surveyor checksStatus
K-0100Meet other general requirements.Waiver has been granted (September 18, 2019)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (July 31, 2019)
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Waiver has been granted (September 18, 2019)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (July 31, 2019)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (July 31, 2019)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (July 31, 2019)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.