Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
OUR LADY OF PERPETUAL HELP
VIRGINIA BEACH, VA · 30 certified beds · Last Life Safety survey June 12, 2025
CMS Certification Number 49E256 · first certified August 1989
Also on this campus
The same campus holds a state-licensed assisted living facility, with its own state record on the Assisted Living Index: Our Lady of Perpetual Help Health Center (4560 Princess Anne Road). Matched by the telephone number the two records share. The records are separate and are never added together.
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within VA
6 citations — more than 26% of the 289 certified nursing homes in VA. Compared within VA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2028 — about 15 months from now. This facility’s last Life Safety survey was June 2025. Facilities in VA are typically surveyed 31–43 months after the last one (median 37), measured over 125 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about OUR LADY OF PERPETUAL HELP
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
1 of the 6 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
How that compares
Compared with the median facility in VA, and nationally. Surveyors differ markedly between states, so the VA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in VA | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| October 2, 2019 | 2 |
| October 14, 2021 | 3 |
| June 12, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | 1 | 2019-10-02 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2025-06-12 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2019-10-02 |
| K-0300 | Meet other general requirements that are deficient. | 1 | 2021-10-14 |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | 1 | 2021-10-14 |
| K-0915 | Have proper power supply for life support equipment. | 1 | 2021-10-14 |
What the citations cover
- Egress Deficiencies 2
- Smoke Deficiencies 2
- Emergency Preparedness Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Egress Deficiencies | 2 |
| Smoke Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 12, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | No revisit needed (July 21, 2025) |
October 14, 2021 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (November 28, 2021) |
| K-0300 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (December 3, 2021) |
| K-0915 | Have proper power supply for life support equipment. | Deficient, Provider has date of correction (December 3, 2021) |
October 2, 2019 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (November 15, 2019) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (November 15, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.