Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

LACAMAS CREEK POST ACUTE

CAMAS, WA · 83 certified beds · Last Life Safety survey July 25, 2025

CMS Certification Number 505273 · first certified April 1983

Ownership

Operated by PACS GROUP · For profit - Limited Liability company

  • Ownership changed August 1, 2024 (change of ownership)from CARE CENTER CAMAS, INC
35
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
8
Tags cited more than once
Across separate surveys
11
Inspection & testing records
Of the citations on file

Position within WA

35 citations — more than 59% of the 193 certified nursing homes in WA. Compared within WA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 8 citations; the earlier surveys in the window averaged 13.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: July 2026 to October 2026. This facility’s last Life Safety survey was July 2025. Facilities in WA are typically surveyed 12–15 months after the last one (median 13), measured over 320 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about LACAMAS CREEK POST ACUTE

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

8 of the 35 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 35 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.

How that compares

Citations on file over three years

Compared with the median facility in WA, and nationally. Surveyors differ markedly between states, so the WA figure is the meaningful one.

This facility35WA median31National median11
Citations on file over three years, compared
MeasureCitations
This facility35
Median facility in WA31
Median facility nationally11

Survey history

Citations at each Life Safety survey
82023-10192024-0982025-07
Citations at each Life Safety survey
Survey dateCitations
October 31, 20238
September 27, 202419
July 25, 20258

Most-cited tags

Most-cited tags at this facility
K-09233K-03213E-00042E-00092K-02112K-05112K-03532K-01002
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0923Have proper medical gas storage and administration areas.32025-07-25
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.32025-07-25
E-0004Develop and maintain an Emergency Preparedness Program (EP).22025-07-25
E-0009Include a process for Emergency Preparedness collaboration.22024-09-27
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.22025-07-25
K-0511Have properly installed electrical wiring and gas equipment.22025-07-25
K-0353Inspect, test, and maintain automatic sprinkler systems.22024-09-27
K-0100Meet other general requirements.22025-07-25

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 11
  • Emergency Preparedness Deficiencies 8
  • Gas, Vacuum, and Electrical Systems Deficiencies 8
  • Services Deficiencies 3
  • Other 5
Citations by CMS category
CategoryCitations
Smoke Deficiencies11
Emergency Preparedness Deficiencies8
Gas, Vacuum, and Electrical Systems Deficiencies8
Services Deficiencies3
Construction Deficiencies2
Egress Deficiencies2
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

July 25, 2025 — 8 citations

Citations issued on July 25, 2025
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (August 22, 2025)
K-0100Meet other general requirements.Deficient, Provider has date of correction (August 22, 2025)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (August 29, 2025)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (August 22, 2025)
K-0325Have properly installed hallway dispensers for alcohol-based hand rub.Deficient, Provider has date of correction (August 22, 2025)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (August 22, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (August 22, 2025)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (August 22, 2025)

September 27, 2024 — 19 citations

Citations issued on September 27, 2024
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (October 31, 2024)
E-0009Include a process for Emergency Preparedness collaboration.Deficient, Provider has date of correction (October 31, 2024)
E-0015Address subsistence needs for staff and patients.Deficient, Provider has date of correction (October 31, 2024)
E-0018Establish procedures for tracking staff and patients during an emergency.Deficient, Provider has date of correction (October 31, 2024)
E-0020Establish policies and procedures including evacuation.Deficient, Provider has date of correction (October 31, 2024)
E-0032Provide primary/alternate means for communication.Deficient, Provider has date of correction (October 24, 2024)
K-0100Meet other general requirements.Deficient, Provider has date of correction (October 31, 2024)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (October 31, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (October 31, 2024)
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.Deficient, Provider has date of correction (October 31, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (December 9, 2024)
K-0354Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours.Deficient, Provider has date of correction (October 31, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (October 31, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (October 31, 2024)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (October 25, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (October 31, 2024)
K-0921Ensure that testing and maintenance of electrical equipment is performed.Deficient, Provider has date of correction (October 31, 2024)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (October 25, 2024)
K-0926Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.Deficient, Provider has date of correction (October 31, 2024)

October 31, 2023 — 8 citations

Citations issued on October 31, 2023
TagWhat the surveyor checksStatus
E-0009Include a process for Emergency Preparedness collaboration.Deficient, Provider has date of correction (November 20, 2023)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (November 20, 2023)
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (November 20, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (November 20, 2023)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (October 30, 2023)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (November 30, 2023)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (November 20, 2023)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (November 20, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.