Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Beacon Hill Rehabilitation
LONGVIEW, WA · 67 certified beds · Last Life Safety survey May 21, 2026
CMS Certification Number 505294 · first certified June 1985
Ownership
Operated by THE ENSIGN GROUP · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within WA
18 citations — more than 17% of the 193 certified nursing homes in WA. Compared within WA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 6.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens May 2027 — about 7 months from now. This facility’s last Life Safety survey was May 2026. Facilities in WA are typically surveyed 12–15 months after the last one (median 13), measured over 320 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Beacon Hill Rehabilitation
One email when it happens. No account; stop it any time with one click.
3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
4 of the 18 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
How that compares
Compared with the median facility in WA, and nationally. Surveyors differ markedly between states, so the WA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 18 |
| Median facility in WA | 31 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 25, 2024 | 4 |
| March 7, 2025 | 9 |
| May 21, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2026-05-21 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2025-03-07 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2026-05-21 |
| E-0020 | Establish policies and procedures including evacuation. | 2 | 2026-05-21 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2025-03-07 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 1 | 2025-03-07 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2025-03-07 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-01-25 |
What the citations cover
- Smoke Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Emergency Preparedness Deficiencies 4
- Services Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Emergency Preparedness Deficiencies | 4 |
| Services Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 21, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0020 | Establish policies and procedures including evacuation. | Deficient, Provider has date of correction (May 28, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (June 16, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (June 16, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 16, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 16, 2026) |
March 7, 2025 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (April 11, 2025) |
| E-0020 | Establish policies and procedures including evacuation. | Deficient, Provider has date of correction (April 11, 2025) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 11, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 11, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 2, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 11, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 11, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (April 11, 2025) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (April 11, 2025) |
January 25, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0032 | Provide primary/alternate means for communication. | Deficient, Provider has date of correction (February 27, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 27, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 27, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 27, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.