Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

LIFE CARE CENTER OF SOUTH HILL

PUYALLUP, WA · 100 certified beds · Last Life Safety survey November 21, 2025

CMS Certification Number 505526 · first certified June 2015

Ownership

Operated by LIFE CARE CENTERS OF AMERICA · For profit - Corporation

  • Ownership changed January 1, 2016 (change of ownership)from VALLEY TERRACE OPERATIONS, LLC
19
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
2
Tags cited more than once
Across separate surveys
8
Inspection & testing records
Of the citations on file

Position within WA

19 citations — more than 20% of the 193 certified nursing homes in WA. Compared within WA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 10 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens November 2026 — about 1 month from now. This facility’s last Life Safety survey was November 2025. Facilities in WA are typically surveyed 12–15 months after the last one (median 13), measured over 320 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about LIFE CARE CENTER OF SOUTH HILL

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

1 of the 19 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in WA, and nationally. Surveyors differ markedly between states, so the WA figure is the meaningful one.

This facility19WA median31National median11
Citations on file over three years, compared
MeasureCitations
This facility19
Median facility in WA31
Median facility nationally11

Survey history

Citations at each Life Safety survey
32023-1062024-10102025-11
Citations at each Life Safety survey
Survey dateCitations
October 12, 20233
October 31, 20246
November 21, 202510

Most-cited tags

Most-cited tags at this facility
K-05112K-02932K-05311K-03741K-03451K-03631E-00091K-03531
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0511Have properly installed electrical wiring and gas equipment.22025-11-21
K-0293Have properly located and lighted "Exit" signs.22025-11-21
K-0531Have elevators that firefighters can control in the event of a fire.12025-11-21
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12024-10-31
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12025-11-21
K-0363Install corridor and hallway doors that block smoke.12025-11-21
E-0009Include a process for Emergency Preparedness collaboration.12025-11-21
K-0353Inspect, test, and maintain automatic sprinkler systems.12024-10-31

What the citations cover

Citations by CMS category
  • Egress Deficiencies 5
  • Smoke Deficiencies 5
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Services Deficiencies 3
  • Other 3
Citations by CMS category
CategoryCitations
Egress Deficiencies5
Smoke Deficiencies5
Gas, Vacuum, and Electrical Systems Deficiencies3
Services Deficiencies3
Emergency Preparedness Deficiencies1
Miscellaneous Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

November 21, 2025 — 10 citations

Citations issued on November 21, 2025
TagWhat the surveyor checksStatus
E-0009Include a process for Emergency Preparedness collaboration.Deficient, Provider has date of correction (December 15, 2025)
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (December 15, 2025)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (December 13, 2025)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (December 24, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (December 15, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (December 15, 2025)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (December 15, 2025)
K-0531Have elevators that firefighters can control in the event of a fire.Deficient, Provider has date of correction (December 15, 2025)
K-0915Have proper power supply for life support equipment.Deficient, Provider has date of correction (December 13, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (December 15, 2025)

October 31, 2024 — 6 citations

Citations issued on October 31, 2024
TagWhat the surveyor checksStatus
K-0100Meet other general requirements.Deficient, Provider has date of correction (November 22, 2024)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (November 22, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (November 22, 2024)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (November 22, 2024)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (November 22, 2024)
K-0753Have restrictions on the use of highly flammable decorations.Deficient, Provider has date of correction (November 22, 2024)

October 12, 2023 — 3 citations

Citations issued on October 12, 2023
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (October 24, 2023)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (October 24, 2023)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (October 24, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.