Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
SKAALEN NURSING AND REHABILITATION CENTER
STOUGHTON, WI · 70 certified beds · Last Life Safety survey January 15, 2026
CMS Certification Number 525512 · first certified June 1993
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Church related
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within WI
23 citations — more than 67% of the 323 certified nursing homes in WI. Compared within WI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys in the window averaged 9. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens February 2027 — about 5 months from now. This facility’s last Life Safety survey was January 2026. Facilities in WI are typically surveyed 13–15 months after the last one (median 14), measured over 516 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about SKAALEN NURSING AND REHABILITATION CENTER
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 23 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 23 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in WI, and nationally. Surveyors differ markedly between states, so the WI figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 23 |
| Median facility in WI | 17 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 23, 2023 | 7 |
| September 10, 2024 | 11 |
| January 15, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2026-01-15 |
| K-0912 | Have power receptacles that are properly grounded. | 2 | 2026-01-15 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 2 | 2024-09-10 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2026-01-15 |
| K-0923 | Have proper medical gas storage and administration areas. | 1 | 2024-09-10 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2023-05-23 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2023-05-23 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-09-10 |
What the citations cover
- Smoke Deficiencies 10
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Egress Deficiencies 4
- Emergency Preparedness Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 10 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Egress Deficiencies | 4 |
| Emergency Preparedness Deficiencies | 2 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 15, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (February 13, 2026) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (February 13, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (February 13, 2026) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (February 13, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (February 13, 2026) |
September 10, 2024 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (October 10, 2024) |
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (October 10, 2024) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (October 10, 2024) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (October 10, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 10, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (November 8, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 16, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 10, 2024) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (October 10, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 10, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (October 10, 2024) |
May 23, 2023 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (June 23, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 23, 2023) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (June 23, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 23, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 23, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (June 23, 2023) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (June 23, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.