Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

RENNES HEALTH AND REHAB CENTER-WESTON

WESTON, WI · 130 certified beds · Last Life Safety survey March 31, 2026

CMS Certification Number 525699 · first certified June 2009

Ownership

Operated by RENNES GROUP · For profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

11
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
4
Inspection & testing records
Of the citations on file

Position within WI

11 citations — more than 20% of the 323 certified nursing homes in WI. Compared within WI rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 1 citation; the earlier surveys in the window averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens May 2027 — about 7 months from now. This facility’s last Life Safety survey was March 2026. Facilities in WI are typically surveyed 13–15 months after the last one (median 14), measured over 516 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about RENNES HEALTH AND REHAB CENTER-WESTON

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in WI, and nationally. Surveyors differ markedly between states, so the WI figure is the meaningful one.

This facility11WI median17National median11
Citations on file over three years, compared
MeasureCitations
This facility11
Median facility in WI17
Median facility nationally11

Survey history

Citations at each Life Safety survey
32024-0472025-0512026-03
Citations at each Life Safety survey
Survey dateCitations
April 3, 20243
May 15, 20257
March 31, 20261

Most-cited tags

Most-cited tags at this facility
K-03721K-02231K-09141K-03631K-09121K-03511K-02221K-03531
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.12025-05-15
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.12025-05-15
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.12025-05-15
K-0363Install corridor and hallway doors that block smoke.12024-04-03
K-0912Have power receptacles that are properly grounded.12025-05-15
K-0351Install an approved automatic sprinkler system.12025-05-15
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.12024-04-03
K-0353Inspect, test, and maintain automatic sprinkler systems.12025-05-15

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 5
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Egress Deficiencies 2
  • Services Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies5
Gas, Vacuum, and Electrical Systems Deficiencies3
Egress Deficiencies2
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

March 31, 2026 — 1 citation

Citations issued on March 31, 2026
TagWhat the surveyor checksStatus
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (April 30, 2026)

May 15, 2025 — 7 citations

Citations issued on May 15, 2025
TagWhat the surveyor checksStatus
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (June 13, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (June 13, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 13, 2025)
K-0362Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke.Deficient, Provider has date of correction (June 13, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (June 13, 2025)
K-0912Have power receptacles that are properly grounded.Deficient, Provider has date of correction (June 13, 2025)
K-0914Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing.Deficient, Provider has date of correction (June 13, 2025)

April 3, 2024 — 3 citations

Citations issued on April 3, 2024
TagWhat the surveyor checksStatus
K-0222Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements.Deficient, Provider has date of correction (April 5, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (April 5, 2024)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (April 5, 2024)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.