Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
MAPLE SPRINGS OF PALMER
PALMER, AK · 67 certified beds · Last Life Safety survey March 27, 2025
CMS Certification Number 025039 · first certified May 2020
Ownership
Operated by MAPLE SPRINGS LIVING · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within AK
24 citations — more than 95% of the 20 certified nursing homes in AK. Compared within AK rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 11 citations; the earlier surveys in the window averaged 6.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Past the typical window (April 2026 to August 2026). Most US facilities have been surveyed by May 2027. This facility’s last Life Safety survey was March 2025. Nursing homes nationally are typically surveyed 12–17 months after the last one (median 14), measured over 19,385 consecutive surveys in the last two years of CMS records. AK has too few recent surveys to measure on its own, so the national interval is used.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about MAPLE SPRINGS OF PALMER
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
6 of the 24 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 24 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in AK, and nationally. Surveyors differ markedly between states, so the AK figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 24 |
| Median facility in AK | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| January 17, 2023 | 10 |
| January 8, 2024 | 3 |
| March 27, 2025 | 11 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 3 | 2025-03-27 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2024-01-08 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2023-01-17 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2025-03-27 |
| E-0030 | List the names and contact information of those in the facility. | 1 | 2025-03-27 |
| E-0024 | Establish policies and procedures for volunteers. | 1 | 2025-03-27 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2023-01-17 |
| K-0300 | Meet other general requirements that are deficient. | 1 | 2023-01-17 |
What the citations cover
- Emergency Preparedness Deficiencies 6
- Miscellaneous Deficiencies 6
- Smoke Deficiencies 5
- Egress Deficiencies 4
- Other 3
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 6 |
| Miscellaneous Deficiencies | 6 |
| Smoke Deficiencies | 5 |
| Egress Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 27, 2025 — 11 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0007 | Address patient/client population and determine types of services needed. | Deficient, Provider has date of correction (April 30, 2025) |
| E-0024 | Establish policies and procedures for volunteers. | Deficient, Provider has date of correction (April 30, 2025) |
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (April 30, 2025) |
| E-0031 | Provide emergency officials' contact information. | Deficient, Provider has date of correction (April 30, 2025) |
| E-0032 | Provide primary/alternate means for communication. | Deficient, Provider has date of correction (April 30, 2025) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (April 30, 2025) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (May 15, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 15, 2025) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (May 15, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (May 15, 2025) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (May 15, 2025) |
January 8, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (February 28, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (February 28, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (March 29, 2024) |
January 17, 2023 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (February 17, 2023) |
| K-0300 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (February 17, 2023) |
| K-0311 | Have an enclosure around a vertical opening shaft. | Deficient, Provider has date of correction (February 17, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 17, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (February 17, 2023) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (February 17, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (February 17, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (February 17, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (February 17, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (February 17, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.