Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
GOSNELL HEALTH AND REHAB
GOSNELL, AR · 70 certified beds · Last Life Safety survey March 26, 2026
CMS Certification Number 045439 · first certified November 2010
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
- Ownership changed November 1, 2018 (change of ownership)from GNNC, INC
Position within AR
10 citations — more than 85% of the 221 certified nursing homes in AR. Compared within AR rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 3 citations; the earlier surveys in the window averaged 2.3. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens April 2027 — about 6 months from now. This facility’s last Life Safety survey was March 2026. Facilities in AR are typically surveyed 12–17 months after the last one (median 15), measured over 307 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about GOSNELL HEALTH AND REHAB
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 10 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 10 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
How that compares
Compared with the median facility in AR, and nationally. Surveyors differ markedly between states, so the AR figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 10 |
| Median facility in AR | 5 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 29, 2023 | 2 |
| September 19, 2024 | 4 |
| February 4, 2026 | 1 |
| March 26, 2026 | 3 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2026-03-26 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 2 | 2026-03-26 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2024-09-19 |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | 1 | 2024-09-19 |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | 1 | 2026-02-04 |
| K-0912 | Have power receptacles that are properly grounded. | 1 | 2026-03-26 |
| E-0041 | Implement emergency and standby power systems. | 1 | 2023-09-29 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2023-09-29 |
What the citations cover
- Smoke Deficiencies 6
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Emergency Preparedness Deficiencies 1
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Emergency Preparedness Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 26, 2026 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 24, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 24, 2026) |
| K-0912 | Have power receptacles that are properly grounded. | Deficient, Provider has date of correction (April 24, 2026) |
February 4, 2026 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (March 2, 2026) |
September 19, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (October 17, 2024) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (October 17, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 21, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (October 17, 2024) |
September 29, 2023 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (October 19, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (October 19, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.