Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CHANDLER POST ACUTE AND REHABILITATION
CHANDLER, AZ · 120 certified beds · Last Life Safety survey December 7, 2023
CMS Certification Number 035101 · first certified January 1985
Ownership
Operated by THE ENSIGN GROUP · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within AZ
1 citations — more than 7% of the 140 certified nursing homes in AZ. Compared within AZ rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
When is the next survey likely?
Well past the typical window (February 2025 to October 2025), and past the point by which nine in ten AZ facilities have been surveyed. This facility’s last Life Safety survey was December 2023. Facilities in AZ are typically surveyed 14–22 months after the last one (median 18), measured over 143 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CHANDLER POST ACUTE AND REHABILITATION
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 1 Life Safety citation above. The Physical Environment Index
How that compares
Compared with the median facility in AZ, and nationally. Surveyors differ markedly between states, so the AZ figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 1 |
| Median facility in AZ | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 17, 2021 | 0 |
| October 20, 2022 | 1 |
| December 7, 2023 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2022-10-20 |
What the citations cover
- Smoke Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
October 20, 2022 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (November 21, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.