Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

PENINSULA POST-ACUTE

BURLINGAME, CA · 62 certified beds · Last Life Safety survey March 27, 2026

CMS Certification Number 555856 · first certified December 2008

Ownership

Operated by PACS GROUP · For profit - Limited Liability company

No change of ownership on CMS record since January 1, 2016, when the records begin.

27
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
6
Tags cited more than once
Across separate surveys
12
Inspection & testing records
Of the citations on file

Position within CA

27 citations — more than 77% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 11. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens April 2027 — about 6 months from now. This facility’s last Life Safety survey was March 2026. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about PENINSULA POST-ACUTE

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

4 of the 27 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 27 Life Safety citations above. The Physical Environment Index

  • F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0908 Keep all essential equipment working safely.

How that compares

Citations on file over three years

Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.

This facility27CA median19National median11
Citations on file over three years, compared
MeasureCitations
This facility27
Median facility in CA19
Median facility nationally11

Survey history

Citations at each Life Safety survey
82022-02142024-1052026-03
Citations at each Life Safety survey
Survey dateCitations
February 18, 20228
October 18, 202414
March 27, 20265

Most-cited tags

Most-cited tags at this facility
K-09203K-03633K-03532K-03462K-01612K-03552E-00291K-05111
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0920Ensure proper usage of power strips and extension cords.32026-03-27
K-0363Install corridor and hallway doors that block smoke.32026-03-27
K-0353Inspect, test, and maintain automatic sprinkler systems.22026-03-27
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.22024-10-18
K-0161Use approved construction type or materials.22024-10-18
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.22024-10-18
E-0029Develop a communication plan.12024-10-18
K-0511Have properly installed electrical wiring and gas equipment.12022-02-18

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 15
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Emergency Preparedness Deficiencies 4
  • Construction Deficiencies 2
  • Other 2
Citations by CMS category
CategoryCitations
Smoke Deficiencies15
Gas, Vacuum, and Electrical Systems Deficiencies4
Emergency Preparedness Deficiencies4
Construction Deficiencies2
Services Deficiencies1
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

March 27, 2026 — 5 citations

Citations issued on March 27, 2026
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (April 7, 2026)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (April 7, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (April 7, 2026)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (April 7, 2026)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (April 7, 2026)

October 18, 2024 — 14 citations

Citations issued on October 18, 2024
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (November 7, 2024)
E-0013Develop Emergency Preparedness policies and procedures.Deficient, Provider has date of correction (November 7, 2024)
E-0029Develop a communication plan.Deficient, Provider has date of correction (November 7, 2024)
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (November 7, 2024)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (November 7, 2024)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (November 7, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (November 7, 2024)
K-0342Have a complete alarm system manually initiated and initiated by fire sprinkler system connection.Deficient, Provider has date of correction (November 7, 2024)
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.Deficient, Provider has date of correction (November 7, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (November 7, 2024)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (November 7, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (November 7, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (November 7, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (November 7, 2024)

February 18, 2022 — 8 citations

Citations issued on February 18, 2022
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (March 14, 2022)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (March 14, 2022)
K-0346Follow proper procedures when the fire alarm was out of service for more than 4 hours.Deficient, Provider has date of correction (March 14, 2022)
K-0354Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours.Deficient, Provider has date of correction (March 14, 2022)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (March 14, 2022)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (March 14, 2022)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (March 14, 2022)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (March 14, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.