Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
CLAREMONT HEIGHTS POST ACUTE
CLAREMONT, CA · 99 certified beds · Last Life Safety survey February 27, 2026
CMS Certification Number 055344 · first certified October 1976
Ownership
Operated by CORPORATE INTERFACE SERVICES · For profit - Individual
- Ownership changed October 11, 2023 (change of ownership)from COUNTRY VILLA CLAREMONT HEALTHCARE CENTER, INC.
Position within CA
16 citations — more than 34% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 5 months from now. This facility’s last Life Safety survey was February 2026. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about CLAREMONT HEIGHTS POST ACUTE
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
17 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 16 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 16 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| December 29, 2023 | 8 |
| January 10, 2025 | 4 |
| February 27, 2026 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0271 | Have exits that are accessible at all times. | 2 | 2025-01-10 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2026-02-27 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2026-02-27 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2026-02-27 |
| K-0351 | Install an approved automatic sprinkler system. | 1 | 2025-01-10 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2023-12-29 |
| K-0919 | Meet requirements for the use of electrical equipment. | 1 | 2023-12-29 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2023-12-29 |
What the citations cover
- Smoke Deficiencies 5
- Egress Deficiencies 4
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Services Deficiencies 2
- Other 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Egress Deficiencies | 4 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Services Deficiencies | 2 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
February 27, 2026 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (March 7, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (March 4, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (March 4, 2026) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (March 16, 2026) |
January 10, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (February 7, 2025) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (February 7, 2025) |
| K-0352 | Properly install and monitor supervisory attachments on automatic sprinkler systems. | Deficient, Provider has date of correction (February 7, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (February 7, 2025) |
December 29, 2023 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (January 26, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (January 26, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.