ROYAL OAKS MANOR-BRADBURY OAKS
DUARTE, CA · 48 certified beds · Last Life Safety survey January 2, 2026
CMS Certification Number 555503 · first certified April 1992
Also on this campus
The same campus holds a state-licensed assisted living facility, with its own state record on the Assisted Living Index: Royal Oaks (1763 Royal Oaks Drive). Matched by the telephone number the two records share. The records are separate and are never added together.
Ownership
Operated by HUMANGOOD · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CA
9 citations — more than 7% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2027 — about 3 months from now. This facility’s last Life Safety survey was January 2026. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about ROYAL OAKS MANOR-BRADBURY OAKS
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
9 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 2, 2023 | 3 |
| November 15, 2024 | 5 |
| January 2, 2026 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 2 | 2026-01-02 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2024-11-15 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2023-11-02 |
| K-0331 | Construct fire resistant interior walls. | 1 | 2023-11-02 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-11-15 |
| K-0361 | Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected. | 1 | 2023-11-02 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 1 | 2024-11-15 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-11-15 |
What the citations cover
- Smoke Deficiencies 7
- Services Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 7 |
| Services Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 2, 2026 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (January 22, 2026) |
November 15, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (December 13, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (December 13, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 13, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (December 13, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (December 13, 2024) |
November 2, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0331 | Construct fire resistant interior walls. | Deficient, Provider has date of correction (December 2, 2023) |
| K-0361 | Ensure that waiting areas, nurse’s stations, gift shops, and cooking facilities, open to the corridor are properly protected. | Deficient, Provider has date of correction (December 2, 2023) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (December 2, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.