Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
SHIELDS NURSING CENTER
EL CERRITO, CA · 45 certified beds · Last Life Safety survey June 5, 2025
CMS Certification Number 555364 · first certified May 1989
Ownership
Independently operated (no chain recorded by CMS) · For profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CA
22 citations — more than 60% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 6 citations; the earlier surveys in the window averaged 8. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: June 2026 to November 2026. This facility’s last Life Safety survey was June 2025. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about SHIELDS NURSING CENTER
One email when it happens. No account; stop it any time with one click.
4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 22 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 22 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 22 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 17, 2022 | 6 |
| November 17, 2023 | 10 |
| June 5, 2025 | 6 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2025-06-05 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2025-06-05 |
| K-0293 | Have properly located and lighted "Exit" signs. | 2 | 2025-06-05 |
| K-0711 | Provide a written emergency evacuation plan. | 2 | 2025-06-05 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2025-06-05 |
| K-0161 | Use approved construction type or materials. | 2 | 2025-06-05 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2023-11-17 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2023-11-17 |
What the citations cover
- Smoke Deficiencies 10
- Egress Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 3
- Emergency Preparedness Deficiencies 2
- Other 4
| Category | Citations |
|---|---|
| Smoke Deficiencies | 10 |
| Egress Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 3 |
| Emergency Preparedness Deficiencies | 2 |
| Construction Deficiencies | 2 |
| Miscellaneous Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 5, 2025 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (July 14, 2025) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (July 14, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (July 14, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 14, 2025) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (July 14, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (July 14, 2025) |
November 17, 2023 — 10 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 13, 2023) |
November 17, 2022 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (December 14, 2022) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (December 14, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 14, 2022) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (December 14, 2022) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 14, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 14, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.