Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
FORTUNA REHABILITATION AND WELLNESS CENTER, LP
FORTUNA, CA · 104 certified beds · Last Life Safety survey November 13, 2025
CMS Certification Number 056361 · first certified February 1973
Ownership
Operated by CORPORATE INTERFACE SERVICES · For profit - Partnership
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CA
38 citations — more than 95% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 15.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2026 — about 2 months from now. This facility’s last Life Safety survey was November 2025. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about FORTUNA REHABILITATION AND WELLNESS CENTER, LP
One email when it happens. No account; stop it any time with one click.
6 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
5 of the 38 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
12 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 38 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
- F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0908 Keep all essential equipment working safely.
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 38 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 12, 2019 | 9 |
| July 27, 2022 | 22 |
| November 13, 2025 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0712 | Have simulated fire drills held at unexpected times. | 3 | 2025-11-13 |
| K-0919 | Meet requirements for the use of electrical equipment. | 2 | 2025-11-13 |
| E-0039 | Conduct testing and exercise requirements. | 2 | 2022-07-27 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2022-07-27 |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | 2 | 2022-07-27 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2022-07-27 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2022-07-27 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2025-11-13 |
What the citations cover
- Smoke Deficiencies 14
- Gas, Vacuum, and Electrical Systems Deficiencies 7
- Miscellaneous Deficiencies 5
- Emergency Preparedness Deficiencies 5
- Other 7
| Category | Citations |
|---|---|
| Smoke Deficiencies | 14 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 7 |
| Miscellaneous Deficiencies | 5 |
| Emergency Preparedness Deficiencies | 5 |
| Services Deficiencies | 4 |
| Egress Deficiencies | 2 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
November 13, 2025 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (December 4, 2025) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (December 4, 2025) |
| K-0374 | Install smoke barrier doors that can resist smoke for at least 20 minutes. | Deficient, Provider has date of correction (December 4, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (December 4, 2025) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (December 4, 2025) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (December 4, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (December 4, 2025) |
July 27, 2022 — 22 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (August 19, 2022) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (August 19, 2022) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0354 | Follow proper procedures when the automatic sprinkler systems was out of service for more than 10 hours. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (August 19, 2022) |
| K-0926 | Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk. | Deficient, Provider has date of correction (August 19, 2022) |
April 12, 2019 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (July 8, 2019) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (July 8, 2019) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (July 8, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 8, 2019) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (July 8, 2019) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (July 8, 2019) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (July 8, 2019) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (July 8, 2019) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (July 8, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.