Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Foundation Skilled Nursing

FRESNO, CA · 59 certified beds · Last Life Safety survey December 9, 2025

CMS Certification Number 056281 · first certified February 1971

Ownership

Operated by JERICHO CARE GROUP · For profit - Limited Liability company

  • Ownership changed April 9, 2021 (change of ownership)from DYCORA TRANSITIONAL HEALTH-MEMORY CARE OF FRESNO LLC
20
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
12
Inspection & testing records
Of the citations on file

Position within CA

20 citations — more than 51% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 13 citations; the earlier surveys in the window averaged 3.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens December 2026 — about 3 months from now. This facility’s last Life Safety survey was December 2025. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Foundation Skilled Nursing

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

4 of the 20 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

14 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 20 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0908 Keep all essential equipment working safely.
  • F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.

How that compares

Citations on file over three years

Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.

This facility20CA median19National median11
Citations on file over three years, compared
MeasureCitations
This facility20
Median facility in CA19
Median facility nationally11

Survey history

Citations at each Life Safety survey
42022-0732024-08132025-12
Citations at each Life Safety survey
Survey dateCitations
July 15, 20224
August 23, 20243
December 9, 202513

Most-cited tags

Most-cited tags at this facility
K-07123E-00411K-03511K-03451K-07811K-03551K-09261E-00041
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0712Have simulated fire drills held at unexpected times.32025-12-09
E-0041Implement emergency and standby power systems.12024-08-23
K-0351Install an approved automatic sprinkler system.12025-12-09
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12025-12-09
K-0781Have restrictions on the use of portable space heaters.12025-12-09
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12025-12-09
K-0926Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.12025-12-09
E-0004Develop and maintain an Emergency Preparedness Program (EP).12025-12-09

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 7
  • Miscellaneous Deficiencies 4
  • Emergency Preparedness Deficiencies 4
  • Egress Deficiencies 2
  • Other 3
Citations by CMS category
CategoryCitations
Smoke Deficiencies7
Miscellaneous Deficiencies4
Emergency Preparedness Deficiencies4
Egress Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies2
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

December 9, 2025 — 13 citations

Citations issued on December 9, 2025
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (January 6, 2026)
E-0030List the names and contact information of those in the facility.Deficient, Provider has date of correction (December 28, 2025)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (January 3, 2026)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (December 31, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (December 28, 2025)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (December 28, 2025)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (December 17, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (December 28, 2025)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (December 28, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (December 28, 2025)
K-0781Have restrictions on the use of portable space heaters.Deficient, Provider has date of correction (December 28, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (December 16, 2025)
K-0926Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.Deficient, Provider has date of correction (December 19, 2025)

August 23, 2024 — 3 citations

Citations issued on August 23, 2024
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (September 5, 2024)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (September 5, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (September 5, 2024)

July 15, 2022 — 4 citations

Citations issued on July 15, 2022
TagWhat the surveyor checksStatus
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (August 2, 2022)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (August 2, 2022)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (August 2, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (August 2, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.