Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
FRESNO POSTACUTE CARE
FRESNO, CA · 80 certified beds · Last Life Safety survey April 10, 2026
CMS Certification Number 555426 · first certified June 1990
Ownership
Operated by RMG CAPITAL PARTNERS · For profit - Corporation
- Ownership changed January 16, 2016 (change of ownership)from FRESNO HEALTHCARE, LLC
Position within CA
19 citations — more than 47% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 6 citations; the earlier surveys in the window averaged 6.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens April 2027 — about 7 months from now. This facility’s last Life Safety survey was April 2026. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about FRESNO POSTACUTE CARE
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
1 of the 19 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
- F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 19 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 31, 2023 | 9 |
| August 16, 2024 | 4 |
| April 10, 2026 | 6 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2026-04-10 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2026-04-10 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2024-08-16 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2023-08-31 |
| K-0161 | Use approved construction type or materials. | 1 | 2023-08-31 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2023-08-31 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2026-04-10 |
| K-0712 | Have simulated fire drills held at unexpected times. | 1 | 2026-04-10 |
What the citations cover
- Smoke Deficiencies 8
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Miscellaneous Deficiencies 2
- Egress Deficiencies 1
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 8 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Miscellaneous Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Construction Deficiencies | 1 |
| Emergency Preparedness Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 10, 2026 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 13, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 13, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (May 13, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 13, 2026) |
| K-0781 | Have restrictions on the use of portable space heaters. | Deficient, Provider has date of correction (May 13, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 13, 2026) |
August 16, 2024 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (August 26, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 26, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (August 26, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (August 26, 2024) |
August 31, 2023 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0032 | Provide primary/alternate means for communication. | Deficient, Provider has date of correction (September 21, 2023) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (September 21, 2023) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (September 21, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 21, 2023) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (September 21, 2023) |
| K-0352 | Properly install and monitor supervisory attachments on automatic sprinkler systems. | Deficient, Provider has date of correction (September 21, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (September 21, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 21, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (September 21, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.