Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

THE GROVE POST ACUTE

GARDEN GROVE, CA · 97 certified beds · Last Life Safety survey June 19, 2025

CMS Certification Number 555021 · first certified May 1980

Ownership

Operated by DAVID JOHNSON · For profit - Limited Liability company

  • Ownership changed August 16, 2022 (change of ownership)from GARDEN GROVE MEDICAL INVESTORS LTD
27
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
8
Tags cited more than once
Across separate surveys
15
Inspection & testing records
Of the citations on file

Position within CA

27 citations — more than 77% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 11.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window is open now: June 2026 to December 2026. This facility’s last Life Safety survey was June 2025. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about THE GROVE POST ACUTE

One email when it happens. No account; stop it any time with one click.

Which alerts

4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

8 of the 27 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 27 Life Safety citations above. The Physical Environment Index

  • F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.

How that compares

Citations on file over three years

Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.

This facility27CA median19National median11
Citations on file over three years, compared
MeasureCitations
This facility27
Median facility in CA19
Median facility nationally11

Survey history

Citations at each Life Safety survey
142022-1292024-0542025-06
Citations at each Life Safety survey
Survey dateCitations
December 2, 202214
May 2, 20249
June 19, 20254

Most-cited tags

Most-cited tags at this facility
K-09233K-09183K-03533E-00392E-00412K-02932E-00302K-03242
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0923Have proper medical gas storage and administration areas.32025-06-19
K-0918Have generator or other power source capable of supplying service within 10 seconds.32025-06-19
K-0353Inspect, test, and maintain automatic sprinkler systems.32025-06-19
E-0039Conduct testing and exercise requirements.22024-05-02
E-0041Implement emergency and standby power systems.22024-05-02
K-0293Have properly located and lighted "Exit" signs.22024-05-02
E-0030List the names and contact information of those in the facility.22024-05-02
K-0324Provide properly protected cooking facilities.22025-06-19

What the citations cover

Citations by CMS category
  • Emergency Preparedness Deficiencies 8
  • Gas, Vacuum, and Electrical Systems Deficiencies 7
  • Smoke Deficiencies 7
  • Egress Deficiencies 3
  • Other 2
Citations by CMS category
CategoryCitations
Emergency Preparedness Deficiencies8
Gas, Vacuum, and Electrical Systems Deficiencies7
Smoke Deficiencies7
Egress Deficiencies3
Construction Deficiencies1
Miscellaneous Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

June 19, 2025 — 4 citations

Citations issued on June 19, 2025
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (July 2, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 26, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (June 26, 2025)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (June 26, 2025)

May 2, 2024 — 9 citations

Citations issued on May 2, 2024
TagWhat the surveyor checksStatus
E-0030List the names and contact information of those in the facility.Deficient, Provider has date of correction (May 21, 2024)
E-0037Establish staff and initial training requirements.Deficient, Provider has date of correction (May 21, 2024)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (May 21, 2024)
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (May 21, 2024)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (May 21, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 21, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (May 21, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (May 21, 2024)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (May 21, 2024)

December 2, 2022 — 14 citations

Citations issued on December 2, 2022
TagWhat the surveyor checksStatus
E-0009Include a process for Emergency Preparedness collaboration.Deficient, Provider has date of correction (January 10, 2023)
E-0030List the names and contact information of those in the facility.Deficient, Provider has date of correction (January 10, 2023)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (January 10, 2023)
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (January 10, 2023)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (January 10, 2023)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (January 10, 2023)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (January 10, 2023)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (January 10, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (January 10, 2023)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (January 10, 2023)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (January 10, 2023)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (January 10, 2023)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (January 10, 2023)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (January 10, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.