Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

HANFORD POST ACUTE

HANFORD, CA · 124 certified beds · Last Life Safety survey January 24, 2025

CMS Certification Number 056288 · first certified January 1973

Ownership

Operated by PACS GROUP · For profit - Limited Liability company

  • Ownership changed January 1, 2017 (change of ownership)from MISSION MEDICAL ENTERPRISES, INC.
15
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
3
Tags cited more than once
Across separate surveys
2
Inspection & testing records
Of the citations on file

Position within CA

15 citations — more than 30% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 6 citations; the earlier surveys in the window averaged 4.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Past the typical window (January 2026 to July 2026). Most CA facilities have been surveyed by June 2027. This facility’s last Life Safety survey was January 2025. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about HANFORD POST ACUTE

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

4 of the 15 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 15 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.

How that compares

Citations on file over three years

Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.

This facility15CA median19National median11
Citations on file over three years, compared
MeasureCitations
This facility15
Median facility in CA19
Median facility nationally11

Survey history

Citations at each Life Safety survey
42019-0352023-1262025-01
Citations at each Life Safety survey
Survey dateCitations
March 18, 20194
December 5, 20235
January 24, 20256

Most-cited tags

Most-cited tags at this facility
K-09202K-02232E-00302K-02931K-02111K-09181K-05001E-00411
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0920Ensure proper usage of power strips and extension cords.22025-01-24
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.22025-01-24
E-0030List the names and contact information of those in the facility.22025-01-24
K-0293Have properly located and lighted "Exit" signs.12019-03-18
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12019-03-18
K-0918Have generator or other power source capable of supplying service within 10 seconds.12023-12-05
K-0500Meet other general requirements that are deficient.12025-01-24
E-0041Implement emergency and standby power systems.12025-01-24

What the citations cover

Citations by CMS category
  • Emergency Preparedness Deficiencies 4
  • Gas, Vacuum, and Electrical Systems Deficiencies 4
  • Egress Deficiencies 4
  • Services Deficiencies 1
  • Other 2
Citations by CMS category
CategoryCitations
Emergency Preparedness Deficiencies4
Gas, Vacuum, and Electrical Systems Deficiencies4
Egress Deficiencies4
Services Deficiencies1
Construction Deficiencies1
Smoke Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

January 24, 2025 — 6 citations

Citations issued on January 24, 2025
TagWhat the surveyor checksStatus
E-0030List the names and contact information of those in the facility.Deficient, Provider has date of correction (February 19, 2025)
E-0031Provide emergency officials' contact information.Deficient, Provider has date of correction (February 19, 2025)
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (February 19, 2025)
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (February 19, 2025)
K-0500Meet other general requirements that are deficient.Deficient, Provider has date of correction (February 11, 2025)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (February 11, 2025)

December 5, 2023 — 5 citations

Citations issued on December 5, 2023
TagWhat the surveyor checksStatus
E-0030List the names and contact information of those in the facility.Deficient, Provider has date of correction (January 8, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (January 8, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (January 8, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (January 8, 2024)
K-0929Ensure precautions for handling oxygen cylinders and equipment are correctly followed.Deficient, Provider has date of correction (January 8, 2024)

March 18, 2019 — 4 citations

Citations issued on March 18, 2019
TagWhat the surveyor checksStatus
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (May 29, 2019)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (May 29, 2019)
K-0223Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector.Deficient, Provider has date of correction (May 29, 2019)
K-0293Have properly located and lighted "Exit" signs.Deficient, Provider has date of correction (May 29, 2019)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.