Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

ALHAMBRA POST ACUTE

MARTINEZ, CA · 44 certified beds · Last Life Safety survey April 23, 2026

CMS Certification Number 555292 · first certified December 1987

Ownership

Operated by PACS GROUP · For profit - Limited Liability company

  • Ownership changed June 30, 2023 (change of ownership)from MARTINEZ HEALTHCARE CENTER, LLC
22
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
4
Tags cited more than once
Across separate surveys
7
Inspection & testing records
Of the citations on file

Position within CA

22 citations — more than 60% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 6 citations; the earlier surveys in the window averaged 8. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens April 2027 — about 7 months from now. This facility’s last Life Safety survey was April 2026. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about ALHAMBRA POST ACUTE

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

8 of the 22 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 22 Life Safety citations above. The Physical Environment Index

  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.

This facility22CA median19National median11
Citations on file over three years, compared
MeasureCitations
This facility22
Median facility in CA19
Median facility nationally11

Survey history

Citations at each Life Safety survey
52023-12112024-1162026-04
Citations at each Life Safety survey
Survey dateCitations
December 1, 20235
November 21, 202411
April 23, 20266

Most-cited tags

Most-cited tags at this facility
K-09202K-03742K-03452E-00042K-03551K-03411E-00391E-00131
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0920Ensure proper usage of power strips and extension cords.22026-04-23
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.22026-04-23
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22024-11-21
E-0004Develop and maintain an Emergency Preparedness Program (EP).22024-11-21
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.12024-11-21
K-0341Install a fire alarm system that can be heard throughout the facility.12026-04-23
E-0039Conduct testing and exercise requirements.12023-12-01
E-0013Develop Emergency Preparedness policies and procedures.12024-11-21

What the citations cover

Citations by CMS category
  • Emergency Preparedness Deficiencies 8
  • Smoke Deficiencies 8
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Miscellaneous Deficiencies 2
  • Other 1
Citations by CMS category
CategoryCitations
Emergency Preparedness Deficiencies8
Smoke Deficiencies8
Gas, Vacuum, and Electrical Systems Deficiencies3
Miscellaneous Deficiencies2
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

April 23, 2026 — 6 citations

Citations issued on April 23, 2026
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (May 8, 2026)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (May 8, 2026)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (May 8, 2026)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (May 8, 2026)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (May 8, 2026)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (May 8, 2026)

November 21, 2024 — 11 citations

Citations issued on November 21, 2024
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (December 13, 2024)
E-0013Develop Emergency Preparedness policies and procedures.Deficient, Provider has date of correction (December 13, 2024)
E-0029Develop a communication plan.Deficient, Provider has date of correction (December 13, 2024)
E-0036Establish emergency prep training and testing.Deficient, Provider has date of correction (December 14, 2024)
K-0161Use approved construction type or materials.Deficient, Provider has date of correction (December 5, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (December 13, 2024)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (December 5, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (December 20, 2024)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (December 4, 2024)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (December 9, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (December 4, 2024)

December 1, 2023 — 5 citations

Citations issued on December 1, 2023
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (December 15, 2023)
E-0006Conduct risk assessment and an All-Hazards approach.Deficient, Provider has date of correction (December 15, 2023)
E-0035Provide family notifications of emergency plan.Deficient, Provider has date of correction (December 15, 2023)
E-0039Conduct testing and exercise requirements.Deficient, Provider has date of correction (December 15, 2023)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (December 15, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.