Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

THE GARDENS HEALTHCARE CENTER

NORTHRIDGE, CA · 45 certified beds · Last Life Safety survey July 17, 2026

CMS Certification Number 555791 · first certified June 2002

Ownership

Operated by ASPEN SKILLED HEALTHCARE · For profit - Limited Liability company

  • Ownership changed August 9, 2022 (change of ownership)to THE GARDENS HEALTH CARE CENTER from SH NORTHRIDGE CA OPCO, LLC
14
Citations on file
CMS's current file
3
Life Safety surveys
CMS's current file
3
Tags cited more than once
Across separate surveys
12
Inspection & testing records
Of the citations on file

Position within CA

14 citations — more than 27% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in CMS's current file.

The latest survey found 4 citations; the earlier surveys on file averaged 5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens July 2027 — about 8 months from now. This facility’s last Life Safety survey was July 2026. Facilities in CA are typically surveyed 12–16 months after the last one (median 14), measured over 1,814 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured

Get an email about THE GARDENS HEALTHCARE CENTER

One email when it happens. No account; stop it any time with one click.

Which alerts

3 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

13 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 14 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.

How that compares

Citations in CMS's current file

Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.

This facility14CA median19National median11
Citations in CMS's current file, compared
MeasureCitations
This facility14
Median facility in CA19
Median facility nationally11

Survey history

Citations at each Life Safety survey
32024-0672025-0542026-07
Citations at each Life Safety survey
Survey dateCitations
June 5, 20243
May 11, 20257
July 17, 20264

Most-cited tags

Most-cited tags at this facility
K-03533K-07122K-03242K-03421K-05111K-09181K-03451K-09261
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0353Inspect, test, and maintain automatic sprinkler systems.32026-07-17
K-0712Have simulated fire drills held at unexpected times.22026-07-17
K-0324Provide properly protected cooking facilities.22026-07-17
K-0342Have a complete alarm system manually initiated and initiated by fire sprinkler system connection.12025-05-11
K-0511Have properly installed electrical wiring and gas equipment.12025-05-11
K-0918Have generator or other power source capable of supplying service within 10 seconds.12025-05-11
K-0345Have approved installation, maintenance and testing program for fire alarm systems.12025-05-11
K-0926Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.12025-05-11

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 8
  • Gas, Vacuum, and Electrical Systems Deficiencies 3
  • Miscellaneous Deficiencies 2
  • Services Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies8
Gas, Vacuum, and Electrical Systems Deficiencies3
Miscellaneous Deficiencies2
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

July 17, 2026 — 4 citations

Citations issued on July 17, 2026
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (August 6, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (August 6, 2026)
K-0355Properly select, install, inspect, or maintain portable fire extinguishes.Deficient, Provider has date of correction (August 6, 2026)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (August 6, 2026)

May 11, 2025 — 7 citations

Citations issued on May 11, 2025
TagWhat the surveyor checksStatus
K-0342Have a complete alarm system manually initiated and initiated by fire sprinkler system connection.Deficient, Provider has date of correction (June 10, 2025)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (June 10, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 10, 2025)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (June 10, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (June 10, 2025)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (June 10, 2025)
K-0926Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk.Deficient, Provider has date of correction (June 10, 2025)

June 5, 2024 — 3 citations

Citations issued on June 5, 2024
TagWhat the surveyor checksStatus
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (June 28, 2024)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (June 28, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (June 28, 2024)

Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.