Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Roseville Point Health & Wellness Center
Roseville, CA · 98 certified beds · Last Life Safety survey May 21, 2026
CMS Certification Number 056139 · first certified December 1969
Ownership
Operated by SOL HEALTHCARE · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CA
47 citations — more than 99% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 20. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens May 2027 — about 8 months from now. This facility’s last Life Safety survey was May 2026. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Roseville Point Health & Wellness Center
One email when it happens. No account; stop it any time with one click.
6 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
8 of the 47 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
12 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 47 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0880 Provide and implement an infection prevention and control program.
- F-0908 Keep all essential equipment working safely.
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 47 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 17, 2023 | 28 |
| October 10, 2024 | 12 |
| May 21, 2026 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2026-05-21 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2026-05-21 |
| K-0363 | Install corridor and hallway doors that block smoke. | 3 | 2026-05-21 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 3 | 2026-05-21 |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | 3 | 2026-05-21 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 3 | 2026-05-21 |
| E-0039 | Conduct testing and exercise requirements. | 2 | 2024-10-10 |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | 2 | 2024-10-10 |
What the citations cover
- Smoke Deficiencies 20
- Gas, Vacuum, and Electrical Systems Deficiencies 10
- Emergency Preparedness Deficiencies 8
- Services Deficiencies 3
- Other 6
| Category | Citations |
|---|---|
| Smoke Deficiencies | 20 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 10 |
| Emergency Preparedness Deficiencies | 8 |
| Services Deficiencies | 3 |
| Egress Deficiencies | 2 |
| Miscellaneous Deficiencies | 2 |
| Construction Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 21, 2026 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (June 12, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 26, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 12, 2026) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (June 12, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 12, 2026) |
| K-0914 | Ensure receptacles at patient bed locations and where general anesthesia is administered, are tested after initial installation, replacement or servicing. | Deficient, Provider has date of correction (June 12, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 12, 2026) |
October 10, 2024 — 12 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (October 23, 2024) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (October 23, 2024) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (October 23, 2024) |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (October 23, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (October 23, 2024) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (October 23, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 23, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (October 23, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (October 23, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (October 23, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 23, 2024) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (October 23, 2024) |
March 17, 2023 — 28 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (April 28, 2023) |
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (April 28, 2023) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (April 28, 2023) |
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (April 28, 2023) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (April 28, 2023) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (April 28, 2023) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0342 | Have a complete alarm system manually initiated and initiated by fire sprinkler system connection. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (April 28, 2023) |
| K-0926 | Ensure that personnel concerned with handling of medical gases and cylinders are trained on the risk. | Deficient, Provider has date of correction (April 28, 2023) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.