Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
SAN MATEO MEDICAL CENTER D/P SNF
SAN MATEO, CA · 345 certified beds · Last Life Safety survey July 3, 2025
CMS Certification Number 555034 · first certified July 1976
Ownership
Independently operated (no chain recorded by CMS) · Government - County
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CA
67 citations — more than 100% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 15 citations; the earlier surveys in the window averaged 17.3. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: July 2026 to December 2026. This facility’s last Life Safety survey was July 2025. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about SAN MATEO MEDICAL CENTER D/P SNF
One email when it happens. No account; stop it any time with one click.
8 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
22 of the 67 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
8 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 67 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 67 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 10, 2021 | 25 |
| November 29, 2023 | 2 |
| March 21, 2024 | 25 |
| July 3, 2025 | 15 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | 4 | 2025-07-03 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 3 | 2025-07-03 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 3 | 2025-07-03 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2025-07-03 |
| K-0711 | Provide a written emergency evacuation plan. | 3 | 2025-07-03 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 3 | 2025-07-03 |
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | 3 | 2025-07-03 |
| E-0041 | Implement emergency and standby power systems. | 3 | 2025-07-03 |
What the citations cover
- Emergency Preparedness Deficiencies 22
- Smoke Deficiencies 21
- Gas, Vacuum, and Electrical Systems Deficiencies 10
- Services Deficiencies 5
- Other 9
| Category | Citations |
|---|---|
| Emergency Preparedness Deficiencies | 22 |
| Smoke Deficiencies | 21 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 10 |
| Services Deficiencies | 5 |
| Miscellaneous Deficiencies | 5 |
| Construction Deficiencies | 2 |
| Egress Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
July 3, 2025 — 15 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (July 28, 2025) |
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (July 28, 2025) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (July 28, 2025) |
| E-0036 | Establish emergency prep training and testing. | Deficient, Provider has date of correction (July 28, 2025) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (August 1, 2025) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (August 1, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (July 31, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (August 11, 2025) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (August 1, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (August 1, 2025) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (July 30, 2025) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (August 1, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 1, 2025) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (August 1, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (August 1, 2025) |
March 21, 2024 — 25 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (May 6, 2024) |
| E-0013 | Develop Emergency Preparedness policies and procedures. | Deficient, Provider has date of correction (May 6, 2024) |
| E-0018 | Establish procedures for tracking staff and patients during an emergency. | Deficient, Provider has date of correction (May 6, 2024) |
| E-0023 | Establish policies and procedures for medical documentation. | Deficient, Provider has date of correction (May 6, 2024) |
| E-0026 | Establish roles under a Waiver declared by secretary. | Deficient, Provider has date of correction (May 6, 2024) |
| E-0029 | Develop a communication plan. | Deficient, Provider has date of correction (May 6, 2024) |
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (May 6, 2024) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0161 | Use approved construction type or materials. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0346 | Follow proper procedures when the fire alarm was out of service for more than 4 hours. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0904 | Have a properly installed medical gas master alarm panel. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (May 6, 2024) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (May 6, 2024) |
November 29, 2023 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (December 19, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (December 19, 2023) |
May 10, 2021 — 25 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0004 | Develop and maintain an Emergency Preparedness Program (EP). | Deficient, Provider has date of correction (June 28, 2021) |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (June 28, 2021) |
| E-0007 | Address patient/client population and determine types of services needed. | Deficient, Provider has date of correction (June 28, 2021) |
| E-0023 | Establish policies and procedures for medical documentation. | Deficient, Provider has date of correction (June 28, 2021) |
| E-0026 | Establish roles under a Waiver declared by secretary. | Deficient, Provider has date of correction (June 28, 2021) |
| E-0030 | List the names and contact information of those in the facility. | Deficient, Provider has date of correction (June 28, 2021) |
| E-0031 | Provide emergency officials' contact information. | Deficient, Provider has date of correction (June 28, 2021) |
| E-0035 | Provide family notifications of emergency plan. | Deficient, Provider has date of correction (June 28, 2021) |
| E-0041 | Implement emergency and standby power systems. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0344 | Have an alternate power supply for its alarm system. | Waiver has been granted (June 28, 2021) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Waiver has been granted (June 28, 2021) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0541 | Install properly constructed and protected linen or trash chutes. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 28, 2021) |
| K-0923 | Have proper medical gas storage and administration areas. | Deficient, Provider has date of correction (June 28, 2021) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.