Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

SOUTH COAST POST ACUTE

SANTA ANA, CA · 255 certified beds · Last Life Safety survey February 28, 2025

CMS Certification Number 055653 · first certified June 1974

Ownership

Operated by WINDSOR · For profit - Limited Liability company

  • Ownership changed March 24, 2023 (change of ownership)from ROYALE HEALTH CARE CENTER INC.
20
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
4
Tags cited more than once
Across separate surveys
13
Inspection & testing records
Of the citations on file

Position within CA

20 citations — more than 51% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Improvingfewer citations at the latest survey than at its earlier surveys in the window.

The latest survey found 5 citations; the earlier surveys in the window averaged 7.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

Past the typical window (March 2026 to August 2026). Most CA facilities have been surveyed by July 2027. This facility’s last Life Safety survey was February 2025. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about SOUTH COAST POST ACUTE

One email when it happens. No account; stop it any time with one click.

Which alerts

4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Physical environment (health survey)

9 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 20 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.

How that compares

Citations on file over three years

Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.

This facility20CA median19National median11
Citations on file over three years, compared
MeasureCitations
This facility20
Median facility in CA19
Median facility nationally11

Survey history

Citations at each Life Safety survey
52022-04102023-1252025-02
Citations at each Life Safety survey
Survey dateCitations
April 19, 20225
December 21, 202310
February 28, 20255

Most-cited tags

Most-cited tags at this facility
K-03633K-03452K-03532K-09182K-09191K-03741K-03241K-09121
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0363Install corridor and hallway doors that block smoke.32025-02-28
K-0345Have approved installation, maintenance and testing program for fire alarm systems.22025-02-28
K-0353Inspect, test, and maintain automatic sprinkler systems.22025-02-28
K-0918Have generator or other power source capable of supplying service within 10 seconds.22025-02-28
K-0919Meet requirements for the use of electrical equipment.12022-04-19
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12023-12-21
K-0324Provide properly protected cooking facilities.12023-12-21
K-0912Have power receptacles that are properly grounded.12023-12-21

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 10
  • Gas, Vacuum, and Electrical Systems Deficiencies 6
  • Services Deficiencies 2
  • Miscellaneous Deficiencies 1
  • Other 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies10
Gas, Vacuum, and Electrical Systems Deficiencies6
Services Deficiencies2
Miscellaneous Deficiencies1
Egress Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

February 28, 2025 — 5 citations

Citations issued on February 28, 2025
TagWhat the surveyor checksStatus
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (March 12, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (March 12, 2025)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (March 12, 2025)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (March 12, 2025)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (March 12, 2025)

December 21, 2023 — 10 citations

Citations issued on December 21, 2023
TagWhat the surveyor checksStatus
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (February 2, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (February 2, 2024)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (February 2, 2024)
K-0351Install an approved automatic sprinkler system.Deficient, Provider has date of correction (February 2, 2024)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (February 2, 2024)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (February 2, 2024)
K-0521Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions.Deficient, Provider has date of correction (February 2, 2024)
K-0912Have power receptacles that are properly grounded.Deficient, Provider has date of correction (February 2, 2024)
K-0918Have generator or other power source capable of supplying service within 10 seconds.Deficient, Provider has date of correction (February 2, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (February 2, 2024)

April 19, 2022 — 5 citations

Citations issued on April 19, 2022
TagWhat the surveyor checksStatus
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (April 28, 2022)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (April 28, 2022)
K-0500Meet other general requirements that are deficient.Deficient, Provider has date of correction (April 28, 2022)
K-0919Meet requirements for the use of electrical equipment.Deficient, Provider has date of correction (April 28, 2022)
K-0923Have proper medical gas storage and administration areas.Deficient, Provider has date of correction (April 28, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.