Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Mission Park Healthcare Center
Santa Barbara, CA · 138 certified beds · Last Life Safety survey December 11, 2024
CMS Certification Number 055991 · first certified July 1969
Ownership
Independently operated (no chain recorded by CMS) · For profit - Limited Liability company
- Ownership changed October 1, 2021 (change of ownership)from CLIFFVIEW TERRACE INC
Position within CA
19 citations — more than 47% of the 1,165 certified nursing homes in CA. Compared within CA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 7 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
Past the typical window (December 2025 to June 2026). Most CA facilities have been surveyed by May 2027. This facility’s last Life Safety survey was December 2024. Facilities in CA are typically surveyed 12–18 months after the last one (median 14), measured over 1,766 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Mission Park Healthcare Center
One email when it happens. No account; stop it any time with one click.
4 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
5 of the 19 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 19 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
How that compares
Compared with the median facility in CA, and nationally. Surveyors differ markedly between states, so the CA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 19 |
| Median facility in CA | 19 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 2, 2019 | 8 |
| January 21, 2022 | 4 |
| December 11, 2024 | 7 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0363 | Install corridor and hallway doors that block smoke. | 3 | 2024-12-11 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 2 | 2024-12-11 |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | 2 | 2022-01-21 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2024-12-11 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2024-12-11 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2024-12-11 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2019-05-02 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2024-12-11 |
What the citations cover
- Smoke Deficiencies 9
- Emergency Preparedness Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Services Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Emergency Preparedness Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 11, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0031 | Provide emergency officials' contact information. | Deficient, Provider has date of correction (December 27, 2024) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (January 22, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (January 14, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (January 14, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (January 15, 2025) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (January 28, 2025) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (January 15, 2025) |
January 21, 2022 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (February 16, 2022) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (February 16, 2022) |
| K-0500 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (February 16, 2022) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (February 16, 2022) |
May 2, 2019 — 8 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (June 27, 2019) |
| E-0018 | Establish procedures for tracking staff and patients during an emergency. | Deficient, Provider has date of correction (June 27, 2019) |
| E-0026 | Establish roles under a Waiver declared by secretary. | Deficient, Provider has date of correction (June 27, 2019) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (June 27, 2019) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (June 27, 2019) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 27, 2019) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (June 27, 2019) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 27, 2019) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.