Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
STORYBROOK CARE & REHABILITATION
FORT COLLINS, CO · 60 certified beds · Last Life Safety survey June 25, 2026
CMS Certification Number 065257 · first certified May 1989
Ownership
Operated by SWEETWATER CARE · For profit - Limited Liability company
- Ownership changed October 16, 2024 (change of ownership)from FRONT RANGE HEALTH & REHABILITATION LLC
Position within CO
20 citations — more than 61% of the 210 certified nursing homes in CO. Compared within CO rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 9 citations; the earlier surveys on file averaged 5.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens December 2027 — about 13 months from now. This facility’s last Life Safety survey was June 2026. Facilities in CO are typically surveyed 18–25 months after the last one (median 21), measured over 187 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about STORYBROOK CARE & REHABILITATION
One email when it happens. No account; stop it any time with one click.
7 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
7 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 20 Life Safety citations above. The Physical Environment Index
- F-0880 Provide and implement an infection prevention and control program.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0921 Make sure that the nursing home area is safe, easy to use, clean and comfortable for residents, staff and the public.
How that compares
Compared with the median facility in CO, and nationally. Surveyors differ markedly between states, so the CO figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 20 |
| Median facility in CO | 16 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 11, 2023 | 4 |
| September 19, 2024 | 7 |
| June 25, 2026 | 9 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | 2 | 2026-06-25 |
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2024-09-19 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2026-06-25 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2026-06-25 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2026-06-25 |
| K-0712 | Have simulated fire drills held at unexpected times. | 2 | 2026-06-25 |
| K-0363 | Install corridor and hallway doors that block smoke. | 2 | 2026-06-25 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 2 | 2026-06-25 |
What the citations cover
- Smoke Deficiencies 10
- Miscellaneous Deficiencies 3
- Services Deficiencies 3
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Other 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 10 |
| Miscellaneous Deficiencies | 3 |
| Services Deficiencies | 3 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Egress Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 25, 2026 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (July 22, 2026) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (September 18, 2026) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 8, 2026) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (July 22, 2026) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (July 23, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (July 29, 2026) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (July 22, 2026) |
| K-0753 | Have restrictions on the use of highly flammable decorations. | Deficient, Provider has date of correction (July 22, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (August 7, 2026) |
September 19, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (November 12, 2024) |
| K-0331 | Construct fire resistant interior walls. | Deficient, Provider has date of correction (November 5, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (November 5, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (October 7, 2024) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (October 3, 2024) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (November 18, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 30, 2024) |
April 11, 2023 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (May 10, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (May 10, 2023) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (May 10, 2023) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (May 8, 2023) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.