Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
MOZAIC SENIOR LIFE
BRIDGEPORT, CT · 294 certified beds · Last Life Safety survey September 29, 2025
CMS Certification Number 075353 · first certified October 1991
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CT
28 citations — more than 95% of the 191 certified nursing homes in CT. Compared within CT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 9 citations; the earlier surveys in the window averaged 9.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens July 2027 — about 9 months from now. This facility’s last Life Safety survey was September 2025. Facilities in CT are typically surveyed 21–28 months after the last one (median 24), measured over 181 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about MOZAIC SENIOR LIFE
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
8 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 28 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in CT, and nationally. Surveyors differ markedly between states, so the CT figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 28 |
| Median facility in CT | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| November 9, 2021 | 6 |
| October 19, 2023 | 13 |
| September 29, 2025 | 9 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | 3 | 2025-09-29 |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | 2 | 2025-09-29 |
| K-0919 | Meet requirements for the use of electrical equipment. | 2 | 2023-10-19 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 2 | 2023-10-19 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-09-29 |
| K-0781 | Have restrictions on the use of portable space heaters. | 1 | 2025-09-29 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2025-09-29 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2023-10-19 |
What the citations cover
- Smoke Deficiencies 9
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Miscellaneous Deficiencies 5
- Egress Deficiencies 5
- Other 3
| Category | Citations |
|---|---|
| Smoke Deficiencies | 9 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Miscellaneous Deficiencies | 5 |
| Egress Deficiencies | 5 |
| Services Deficiencies | 2 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 29, 2025 — 9 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0163 | Install noncombustible or limited-combustible interior walls. | Deficient, Provider has date of correction (December 10, 2025) |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (December 10, 2025) |
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (December 10, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 10, 2025) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (December 10, 2025) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (December 10, 2025) |
| K-0781 | Have restrictions on the use of portable space heaters. | Deficient, Provider has date of correction (December 10, 2025) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (December 10, 2025) |
| K-0927 | Have proper fire barriers, ventilation and signs for the transfilling of oxygen. | Deficient, Provider has date of correction (December 10, 2025) |
October 19, 2023 — 13 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0200 | Meet other general requirements. | Deficient, Provider has date of correction (November 28, 2023) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (November 28, 2023) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (November 28, 2023) |
| K-0347 | Properly provide smoke detection systems in areas open to corridors. | Deficient, Provider has date of correction (November 28, 2023) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (November 28, 2023) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (November 28, 2023) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (November 28, 2023) |
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (November 28, 2023) |
| K-0712 | Have simulated fire drills held at unexpected times. | Deficient, Provider has date of correction (November 28, 2023) |
| K-0753 | Have restrictions on the use of highly flammable decorations. | Deficient, Provider has date of correction (November 28, 2023) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (November 28, 2023) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (November 28, 2023) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (November 28, 2023) |
November 9, 2021 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (January 12, 2022) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (January 12, 2022) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (January 12, 2022) |
| K-0362 | Ensure that corridors are separated from use areas by walls constructed to limit the passage of smoke. | Deficient, Provider has date of correction (January 12, 2022) |
| K-0522 | Have an externally vented heating system. | Deficient, Provider has date of correction (January 12, 2022) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (January 12, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.