Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PIERCE MEMORIAL BAPTIST HOME, INC.
BROOKLYN, CT · 72 certified beds · Last Life Safety survey June 18, 2024
CMS Certification Number 075243 · first certified March 1974
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CT
5 citations — more than 25% of the 191 certified nursing homes in CT. Compared within CT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 1.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: March 2026 to October 2026. This facility’s last Life Safety survey was June 2024. Facilities in CT are typically surveyed 21–28 months after the last one (median 24), measured over 181 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PIERCE MEMORIAL BAPTIST HOME, INC.
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 5 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in CT, and nationally. Surveyors differ markedly between states, so the CT figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 5 |
| Median facility in CT | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| September 12, 2019 | 0 |
| March 17, 2022 | 3 |
| June 18, 2024 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2022-03-17 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2022-03-17 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2022-03-17 |
| K-0500 | Meet other general requirements that are deficient. | 1 | 2024-06-18 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-06-18 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Egress Deficiencies 1
- Services Deficiencies 1
- Miscellaneous Deficiencies 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Services Deficiencies | 1 |
| Miscellaneous Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 18, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0500 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (June 26, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 26, 2024) |
March 17, 2022 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (June 9, 2022) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (June 9, 2022) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 9, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.