Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PIERCE MEMORIAL BAPTIST HOME, INC.
BROOKLYN, CT · 72 certified beds · Last Life Safety survey March 27, 2026
CMS Certification Number 075243 · first certified March 1974
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CT
6 citations — more than 30% of the 191 certified nursing homes in CT. Compared within CT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys on file averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2027 — about 12 months from now. This facility’s last Life Safety survey was March 2026. Facilities in CT are typically surveyed 20–26 months after the last one (median 22), measured over 228 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about PIERCE MEMORIAL BAPTIST HOME, INC.
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in CT, and nationally. Surveyors differ markedly between states, so the CT figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in CT | 11 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 17, 2022 | 3 |
| June 18, 2024 | 2 |
| March 27, 2026 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2022-03-17 |
| K-0711 | Provide a written emergency evacuation plan. | 1 | 2026-03-27 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2022-03-17 |
| K-0500 | Meet other general requirements that are deficient. | 1 | 2024-06-18 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2022-03-17 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2024-06-18 |
What the citations cover
- Miscellaneous Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 2
- Services Deficiencies 1
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Miscellaneous Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 2 |
| Services Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 27, 2026 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0711 | Provide a written emergency evacuation plan. | Deficient, Provider has date of correction (May 15, 2026) |
June 18, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0500 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (June 26, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 26, 2024) |
March 17, 2022 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (June 9, 2022) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (June 9, 2022) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (June 9, 2022) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.