Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
LEEWAY, INC
NEW HAVEN, CT · 30 certified beds · Last Life Safety survey December 30, 2025
CMS Certification Number 075408 · first certified November 1995
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within CT
3 citations — more than 14% of the 191 certified nursing homes in CT. Compared within CT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 0.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens October 2027 — about 12 months from now. This facility’s last Life Safety survey was December 2025. Facilities in CT are typically surveyed 21–28 months after the last one (median 24), measured over 181 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about LEEWAY, INC
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
1 physical-environment citation on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 3 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
How that compares
Compared with the median facility in CT, and nationally. Surveyors differ markedly between states, so the CT figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 3 |
| Median facility in CT | 10 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 17, 2022 | 0 |
| June 6, 2024 | 1 |
| December 30, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2025-12-30 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-06-06 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2025-12-30 |
What the citations cover
- Egress Deficiencies 2
- Smoke Deficiencies 1
| Category | Citations |
|---|---|
| Egress Deficiencies | 2 |
| Smoke Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 30, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (February 3, 2026) |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (February 3, 2026) |
June 6, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (July 17, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.