Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
VILLA AT STAMFORD, THE
STAMFORD, CT · 128 certified beds · Last Life Safety survey June 3, 2026
CMS Certification Number 075153 · first certified January 1967
Ownership
Operated by CENTER MANAGEMENT GROUP · For profit - Limited Liability company
- Ownership changed August 9, 2016 (change of ownership)to THE VILLA AT STAMFORD from CITY OF STAMFORD
Position within CT
11 citations — more than 50% of the 191 certified nursing homes in CT. Compared within CT rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 5 citations; the earlier surveys on file averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2028 — about 15 months from now. This facility’s last Life Safety survey was June 2026. Facilities in CT are typically surveyed 20–26 months after the last one (median 22), measured over 228 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about VILLA AT STAMFORD, THE
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities cited for sprinkler inspection and testing in CMS’s current file are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0880 Provide and implement an infection prevention and control program.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
How that compares
Compared with the median facility in CT, and nationally. Surveyors differ markedly between states, so the CT figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in CT | 11 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| February 2, 2022 | 0 |
| July 30, 2024 | 6 |
| June 3, 2026 | 5 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 2 | 2026-06-03 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-07-30 |
| K-0344 | Have an alternate power supply for its alarm system. | 1 | 2026-06-03 |
| K-0919 | Meet requirements for the use of electrical equipment. | 1 | 2026-06-03 |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | 1 | 2026-06-03 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2026-06-03 |
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | 1 | 2024-07-30 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-07-30 |
What the citations cover
- Smoke Deficiencies 5
- Gas, Vacuum, and Electrical Systems Deficiencies 4
- Egress Deficiencies 1
- Services Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 4 |
| Egress Deficiencies | 1 |
| Services Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 3, 2026 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0344 | Have an alternate power supply for its alarm system. | Deficient, Provider has date of correction (July 13, 2026) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (July 13, 2026) |
| K-0521 | Ensure heating and ventilation systems that have been properly installed according to the manufacturer's instructions. | Deficient, Provider has date of correction (July 13, 2026) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 16, 2026) |
| K-0919 | Meet requirements for the use of electrical equipment. | Deficient, Provider has date of correction (September 16, 2026) |
July 30, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0222 | Add doors in an exit area that do not require the use of a key from the exit side unless in case of special locking arrangements. | Deficient, Provider has date of correction (September 3, 2024) |
| K-0351 | Install an approved automatic sprinkler system. | Deficient, Provider has date of correction (September 3, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (September 3, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 3, 2024) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (September 3, 2024) |
| K-0921 | Ensure that testing and maintenance of electrical equipment is performed. | Deficient, Provider has date of correction (September 3, 2024) |
Reflects the CMS posting of October 1, 2026. Surveys conducted in the last few months may not appear yet.