Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
LUXE AT JUPITER REHABILITATION CENTER (THE)
JUPITER, FL · 129 certified beds · Last Life Safety survey April 4, 2025
CMS Certification Number 106148 · first certified August 2021
Ownership
Independently operated (no chain recorded by CMS) · For profit - Partnership
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within FL
5 citations — more than 34% of the 694 certified nursing homes in FL. Compared within FL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 2. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: July 2026 to February 2027. This facility’s last Life Safety survey was April 2025. Facilities in FL are typically surveyed 15–23 months after the last one (median 17), measured over 729 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about LUXE AT JUPITER REHABILITATION CENTER (THE)
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
7 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 5 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in FL, and nationally. Surveyors differ markedly between states, so the FL figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 5 |
| Median facility in FL | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 11, 2022 | 1 |
| December 7, 2023 | 3 |
| April 4, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | 1 | 2025-04-04 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2023-12-07 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2022-08-11 |
| K-0500 | Meet other general requirements that are deficient. | 1 | 2023-12-07 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 1 | 2023-12-07 |
What the citations cover
- Miscellaneous Deficiencies 2
- Egress Deficiencies 1
- Services Deficiencies 1
- Smoke Deficiencies 1
| Category | Citations |
|---|---|
| Miscellaneous Deficiencies | 2 |
| Egress Deficiencies | 1 |
| Services Deficiencies | 1 |
| Smoke Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 4, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0741 | Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed. | Deficient, Provider has date of correction (April 22, 2025) |
December 7, 2023 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (February 12, 2024) |
| K-0500 | Meet other general requirements that are deficient. | Deficient, Provider has date of correction (February 12, 2024) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (January 29, 2024) |
August 11, 2022 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (September 26, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.