Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
SPRINGS AT LAKE POINTE WOODS
SARASOTA, FL · 101 certified beds · Last Life Safety survey April 23, 2026
CMS Certification Number 105567 · first certified December 1986
Ownership
Operated by SUMMIT CARE · For profit - Limited Liability company
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within FL
11 citations — more than 73% of the 694 certified nursing homes in FL. Compared within FL rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 3.3. With 4 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens August 2027 — about 10 months from now. This facility’s last Life Safety survey was April 2026. Facilities in FL are typically surveyed 15–23 months after the last one (median 17), measured over 729 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about SPRINGS AT LAKE POINTE WOODS
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 11 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in FL, and nationally. Surveyors differ markedly between states, so the FL figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 11 |
| Median facility in FL | 7 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 3, 2022 | 3 |
| December 14, 2023 | 6 |
| May 15, 2024 | 1 |
| April 23, 2026 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 3 | 2024-05-15 |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | 2 | 2026-04-23 |
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | 1 | 2022-03-03 |
| K-0920 | Ensure proper usage of power strips and extension cords. | 1 | 2022-03-03 |
| K-0915 | Have proper power supply for life support equipment. | 1 | 2023-12-14 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2023-12-14 |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | 1 | 2023-12-14 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2023-12-14 |
What the citations cover
- Gas, Vacuum, and Electrical Systems Deficiencies 6
- Miscellaneous Deficiencies 2
- Smoke Deficiencies 2
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Gas, Vacuum, and Electrical Systems Deficiencies | 6 |
| Miscellaneous Deficiencies | 2 |
| Smoke Deficiencies | 2 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
April 23, 2026 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (May 17, 2026) |
May 15, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (June 7, 2024) |
December 14, 2023 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (December 13, 2023) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 15, 2023) |
| K-0761 | To conduct inspection, testing and maintenance of fire doors by qualified individuals. | Deficient, Provider has date of correction (December 15, 2023) |
| K-0915 | Have proper power supply for life support equipment. | Deficient, Provider has date of correction (December 15, 2023) |
| K-0916 | Have a battery powered remote alarm panel in a location accessible by operating personnel. | Deficient, Provider has date of correction (December 15, 2023) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (December 15, 2023) |
March 3, 2022 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0291 | Install emergency lighting that can last at least 1 1/2 hours. | Deficient, Provider has date of correction (March 4, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (March 9, 2022) |
| K-0920 | Ensure proper usage of power strips and extension cords. | Deficient, Provider has date of correction (April 2, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.