Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Buckhead Center for Nursing & Healing
Atlanta, GA · 179 certified beds · Last Life Safety survey September 25, 2025
CMS Certification Number 115110 · first certified June 1976
Ownership
Operated by EMPIRE CARE CENTERS · For profit - Limited Liability company
- Ownership changed October 1, 2022 (change of ownership)to BUCKHEAD CENTER FOR NURSING AND HEALING from LP ATLANTA LLC
Position within GA
8 citations — more than 47% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens November 2026 — about 2 months from now. This facility’s last Life Safety survey was September 2025. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Buckhead Center for Nursing & Healing
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 8 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 8 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 9, 2022 | 0 |
| July 25, 2024 | 6 |
| September 25, 2025 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2025-09-25 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-07-25 |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2024-07-25 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-09-25 |
| K-0293 | Have properly located and lighted "Exit" signs. | 1 | 2024-07-25 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-07-25 |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | 1 | 2024-07-25 |
What the citations cover
- Smoke Deficiencies 5
- Services Deficiencies 2
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 5 |
| Services Deficiencies | 2 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
September 25, 2025 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 5, 2025) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (December 5, 2025) |
July 25, 2024 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0293 | Have properly located and lighted "Exit" signs. | Deficient, Provider has date of correction (September 3, 2024) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (September 3, 2024) |
| K-0355 | Properly select, install, inspect, or maintain portable fire extinguishes. | Deficient, Provider has date of correction (September 3, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (September 3, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (September 3, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (September 3, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.