Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

PERIMETER REHABILITATION SUITES BY HARBORVIEW

ATLANTA, GA · 240 certified beds · Last Life Safety survey March 19, 2026

CMS Certification Number 115270 · first certified July 1979

Ownership

Operated by HARBORVIEW HEALTH SYSTEMS · For profit - Limited Liability company

  • Ownership changed April 1, 2022 (change of ownership)from DUNWOODY OPERATING COMPANY LLC
6
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
1
Tags cited more than once
Across separate surveys
3
Inspection & testing records
Of the citations on file

Position within GA

6 citations — more than 33% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 4 citations; the earlier surveys in the window averaged 1. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens May 2027 — about 8 months from now. This facility’s last Life Safety survey was March 2026. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about PERIMETER REHABILITATION SUITES BY HARBORVIEW

One email when it happens. No account; stop it any time with one click.

Which alerts

Physical environment (health survey)

9 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0909 Regularly inspect all bed frames, mattresses, and bed rails (if any) for safety; and all bed rails and mattresses must attach safely to the bed frame.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0924 Put firmly secured handrails on each side of hallways.

How that compares

Citations on file over three years

Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.

This facility6GA median8National median11
Citations on file over three years, compared
MeasureCitations
This facility6
Median facility in GA8
Median facility nationally11

Survey history

Citations at each Life Safety survey
22023-1002025-0642026-03
Citations at each Life Safety survey
Survey dateCitations
October 13, 20232
June 17, 20250
March 19, 20264

Most-cited tags

Most-cited tags at this facility
K-03312K-03531K-03631K-05111K-03211
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0331Construct fire resistant interior walls.22026-03-19
K-0353Inspect, test, and maintain automatic sprinkler systems.12026-03-19
K-0363Install corridor and hallway doors that block smoke.12023-10-13
K-0511Have properly installed electrical wiring and gas equipment.12026-03-19
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.12026-03-19

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 5
  • Services Deficiencies 1
Citations by CMS category
CategoryCitations
Smoke Deficiencies5
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

March 19, 2026 — 4 citations

Citations issued on March 19, 2026
TagWhat the surveyor checksStatus
K-0321Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system.Deficient, Provider has date of correction (May 2, 2026)
K-0331Construct fire resistant interior walls.Deficient, Provider has date of correction (May 2, 2026)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (May 2, 2026)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (May 2, 2026)

October 13, 2023 — 2 citations

Citations issued on October 13, 2023
TagWhat the surveyor checksStatus
K-0331Construct fire resistant interior walls.Deficient, Provider has date of correction (November 27, 2023)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (November 27, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.