Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
SADIE G. MAYS HEALTH & REHABILITATION CENTER
ATLANTA, GA · 206 certified beds · Last Life Safety survey December 19, 2025
CMS Certification Number 115542 · first certified April 1993
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within GA
9 citations — more than 54% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 4. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens February 2027 — about 5 months from now. This facility’s last Life Safety survey was December 2025. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about SADIE G. MAYS HEALTH & REHABILITATION CENTER
One email when it happens. No account; stop it any time with one click.
2 inspection-and-testing tags have been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 9 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
8 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 9 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
- F-0919 Make sure that a working call system is available in each resident's bathroom and bathing area.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0925 Make sure there is a pest control program to prevent/deal with mice, insects, or other pests.
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 9 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| August 19, 2022 | 6 |
| October 24, 2024 | 2 |
| December 19, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2025-12-19 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 2 | 2024-10-24 |
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | 1 | 2022-08-19 |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | 1 | 2022-08-19 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2022-08-19 |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | 1 | 2022-08-19 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2024-10-24 |
What the citations cover
- Smoke Deficiencies 4
- Emergency Preparedness Deficiencies 2
- Services Deficiencies 2
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Emergency Preparedness Deficiencies | 2 |
| Services Deficiencies | 2 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
December 19, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (January 17, 2026) |
October 24, 2024 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (December 23, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 23, 2024) |
August 19, 2022 — 6 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (October 3, 2022) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (October 3, 2022) |
| K-0343 | Have a fire alarm with audible and visual signals that transmits the alarm automatically to notify emergency forces in event of fire. | Deficient, Provider has date of correction (October 3, 2022) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (October 3, 2022) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (October 3, 2022) |
| K-0918 | Have generator or other power source capable of supplying service within 10 seconds. | Deficient, Provider has date of correction (October 3, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.