Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

REGENCY PARK HEALTH AND REHABILITATION

DALTON, GA · 100 certified beds · Last Life Safety survey August 14, 2025

CMS Certification Number 115663 · first certified July 1999

Ownership

Independently operated (no chain recorded by CMS) · Non profit - Corporation

No change of ownership on CMS record since January 1, 2016, when the records begin.

6
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
0
Tags cited more than once
Across separate surveys
3
Inspection & testing records
Of the citations on file

Position within GA

6 citations — more than 33% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Holding steadyabout the same at the latest survey as at its earlier surveys in the window.

The latest survey found 3 citations; the earlier surveys in the window averaged 1.5. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens October 2026 — about 1 month from now. This facility’s last Life Safety survey was August 2025. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about REGENCY PARK HEALTH AND REHABILITATION

One email when it happens. No account; stop it any time with one click.

Which alerts

Emergency preparedness

1 of the 6 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index

  • F-0880 Provide and implement an infection prevention and control program.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.

How that compares

Citations on file over three years

Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.

This facility6GA median8National median11
Citations on file over three years, compared
MeasureCitations
This facility6
Median facility in GA8
Median facility nationally11

Survey history

Citations at each Life Safety survey
32022-0502024-0432025-08
Citations at each Life Safety survey
Survey dateCitations
May 12, 20223
April 11, 20240
August 14, 20253

Most-cited tags

Most-cited tags at this facility
K-01111K-07121K-03531K-02251E-00411K-05111
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0111Satisfy building requirements after a repair, renovation, modification, or change of user/occupancy.12022-05-12
K-0712Have simulated fire drills held at unexpected times.12022-05-12
K-0353Inspect, test, and maintain automatic sprinkler systems.12025-08-14
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.12025-08-14
E-0041Implement emergency and standby power systems.12022-05-12
K-0511Have properly installed electrical wiring and gas equipment.12025-08-14

What the citations cover

Citations by CMS category
  • Emergency Preparedness Deficiencies 1
  • Smoke Deficiencies 1
  • Egress Deficiencies 1
  • Miscellaneous Deficiencies 1
  • Other 2
Citations by CMS category
CategoryCitations
Emergency Preparedness Deficiencies1
Smoke Deficiencies1
Egress Deficiencies1
Miscellaneous Deficiencies1
Services Deficiencies1
Construction Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

August 14, 2025 — 3 citations

Citations issued on August 14, 2025
TagWhat the surveyor checksStatus
K-0225Have stairways and smokeproof enclosures used as exits that meet safety requirements.Deficient, Provider has date of correction (September 28, 2025)
K-0353Inspect, test, and maintain automatic sprinkler systems.Deficient, Provider has date of correction (October 21, 2025)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (September 28, 2025)

May 12, 2022 — 3 citations

Citations issued on May 12, 2022
TagWhat the surveyor checksStatus
E-0041Implement emergency and standby power systems.Deficient, Provider has date of correction (July 8, 2022)
K-0111Satisfy building requirements after a repair, renovation, modification, or change of user/occupancy.Deficient, Provider has date of correction (July 8, 2022)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (July 8, 2022)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.