Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
RIDGEWOOD MANOR HEALTH AND REHABILITATION
DALTON, GA · 102 certified beds · Last Life Safety survey May 7, 2026
CMS Certification Number 115341 · first certified June 1987
Ownership
Independently operated (no chain recorded by CMS) · Non profit - Corporation
No change of ownership on CMS record since January 1, 2016, when the records begin.
Position within GA
6 citations — more than 32% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys on file averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens July 2027 — about 8 months from now. This facility’s last Life Safety survey was May 2026. Facilities in GA are typically surveyed 14–19 months after the last one (median 16), measured over 546 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to about three years in Virginia. How the window is measured
Get an email about RIDGEWOOD MANOR HEALTH AND REHABILITATION
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
2 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| June 4, 2023 | 2 |
| March 27, 2025 | 3 |
| May 7, 2026 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2026-05-07 |
| K-0271 | Have exits that are accessible at all times. | 1 | 2025-03-27 |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | 1 | 2025-03-27 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2025-03-27 |
| K-0324 | Provide properly protected cooking facilities. | 1 | 2023-06-04 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2023-06-04 |
What the citations cover
- Smoke Deficiencies 4
- Egress Deficiencies 1
- Gas, Vacuum, and Electrical Systems Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Egress Deficiencies | 1 |
| Gas, Vacuum, and Electrical Systems Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
May 7, 2026 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (June 15, 2026) |
March 27, 2025 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0271 | Have exits that are accessible at all times. | Deficient, Provider has date of correction (May 2, 2025) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (May 2, 2025) |
| K-0911 | Meet requirements for the installation and maintenance of electrical systems. | Deficient, Provider has date of correction (May 2, 2025) |
June 4, 2023 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0324 | Provide properly protected cooking facilities. | Deficient, Provider has date of correction (July 19, 2023) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (July 19, 2023) |