Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
JASPER POINT OF JOURNEY LLC
JASPER, GA · 60 certified beds · Last Life Safety survey November 21, 2025
CMS Certification Number 115502 · first certified December 1989
Ownership
Operated by JOURNEY HEALTHCARE · For profit - Limited Liability company
- New ownershipOwnership changed November 1, 2024 (change of ownership)from GAJASPER SNF LLC
Position within GA
6 citations — more than 33% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 4 citations; the earlier surveys in the window averaged 1. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens January 2027 — about 4 months from now. This facility’s last Life Safety survey was November 2025. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about JASPER POINT OF JOURNEY LLC
One email when it happens. No account; stop it any time with one click.
Emergency preparedness
1 of the 6 citations on file is Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
8 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 6 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
- F-0908 Keep all essential equipment working safely.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 6 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| May 22, 2022 | 1 |
| July 21, 2024 | 1 |
| November 21, 2025 | 4 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 1 | 2025-11-21 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2024-07-21 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2025-11-21 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2025-11-21 |
| E-0037 | Establish staff and initial training requirements. | 1 | 2022-05-22 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2025-11-21 |
What the citations cover
- Smoke Deficiencies 4
- Emergency Preparedness Deficiencies 1
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Emergency Preparedness Deficiencies | 1 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
November 21, 2025 — 4 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (December 10, 2025) |
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (December 10, 2025) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 10, 2025) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (December 10, 2025) |
July 21, 2024 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (September 4, 2024) |
May 22, 2022 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0037 | Establish staff and initial training requirements. | Deficient, Provider has date of correction (June 24, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.