Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
MARIETTA CENTER FOR NURSING AND HEALING
MARIETTA, GA · 154 certified beds · Last Life Safety survey June 15, 2025
CMS Certification Number 115206 · first certified November 1977
Ownership
Operated by EMPIRE CARE CENTERS · For profit - Limited Liability company
- Ownership changed October 1, 2022 (change of ownership)from LP MARIETTA LLC
Position within GA
7 citations — more than 40% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 1 citation; the earlier surveys in the window averaged 3. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window is open now: August 2026 to February 2027. This facility’s last Life Safety survey was June 2025. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about MARIETTA CENTER FOR NURSING AND HEALING
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Emergency preparedness
2 of the 7 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index
Physical environment (health survey)
5 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 7 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| March 24, 2022 | 3 |
| February 15, 2024 | 3 |
| June 15, 2025 | 1 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | 2 | 2025-06-15 |
| K-0364 | Install properly constructed windows in hallway walls or doors. | 1 | 2024-02-15 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-02-15 |
| K-0111 | Satisfy building requirements after a repair, renovation, modification, or change of user/occupancy. | 1 | 2022-03-24 |
| E-0039 | Conduct testing and exercise requirements. | 1 | 2022-03-24 |
| E-0006 | Conduct risk assessment and an All-Hazards approach. | 1 | 2022-03-24 |
What the citations cover
- Smoke Deficiencies 4
- Emergency Preparedness Deficiencies 2
- Construction Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 4 |
| Emergency Preparedness Deficiencies | 2 |
| Construction Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
June 15, 2025 — 1 citation
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (August 10, 2025) |
February 15, 2024 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0345 | Have approved installation, maintenance and testing program for fire alarm systems. | Deficient, Provider has date of correction (March 26, 2024) |
| K-0364 | Install properly constructed windows in hallway walls or doors. | Deficient, Provider has date of correction (March 26, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (March 26, 2024) |
March 24, 2022 — 3 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| E-0006 | Conduct risk assessment and an All-Hazards approach. | Deficient, Provider has date of correction (April 29, 2022) |
| E-0039 | Conduct testing and exercise requirements. | Deficient, Provider has date of correction (April 29, 2022) |
| K-0111 | Satisfy building requirements after a repair, renovation, modification, or change of user/occupancy. | Deficient, Provider has date of correction (April 29, 2022) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.