Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
PARKSIDE POST ACUTE AND REHABILITATION
SNELLVILLE, GA · 167 certified beds · Last Life Safety survey August 7, 2025
CMS Certification Number 115643 · first certified August 1997
Ownership
Operated by WELLINGTON HEALTH CARE SERVICES · For profit - Limited Liability company
- Ownership changed September 1, 2018 (change of ownership)from SCEPTER REHABILITATION AND HEALTHCARE CENTER, LLC
Position within GA
7 citations — more than 40% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
When is the next survey likely?
The window opens October 2026. This facility’s last Life Safety survey was August 2025. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about PARKSIDE POST ACUTE AND REHABILITATION
One email when it happens. No account; stop it any time with one click.
Physical environment (health survey)
6 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 7 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| April 1, 2022 | 0 |
| March 24, 2024 | 7 |
| August 7, 2025 | 0 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2024-03-24 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-03-24 |
| K-0281 | Install proper backup exit lighting. | 1 | 2024-03-24 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-03-24 |
| K-0363 | Install corridor and hallway doors that block smoke. | 1 | 2024-03-24 |
| K-0364 | Install properly constructed windows in hallway walls or doors. | 1 | 2024-03-24 |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | 1 | 2024-03-24 |
What the citations cover
- Smoke Deficiencies 6
- Egress Deficiencies 1
| Category | Citations |
|---|---|
| Smoke Deficiencies | 6 |
| Egress Deficiencies | 1 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
March 24, 2024 — 7 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0281 | Install proper backup exit lighting. | Deficient, Provider has date of correction (April 23, 2024) |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (April 23, 2024) |
| K-0341 | Install a fire alarm system that can be heard throughout the facility. | Deficient, Provider has date of correction (April 23, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (April 23, 2024) |
| K-0363 | Install corridor and hallway doors that block smoke. | Deficient, Provider has date of correction (April 23, 2024) |
| K-0364 | Install properly constructed windows in hallway walls or doors. | Deficient, Provider has date of correction (April 23, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (April 23, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.