Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record

Woods at Sparta of Journey LLC, The

SPARTA, GA · 71 certified beds · Last Life Safety survey December 11, 2025

CMS Certification Number 115397 · first certified September 1989

Ownership

Independently operated (no chain recorded by CMS) · For profit - Corporation

  • Ownership changed June 21, 2021 (change of ownership)to PROVIDENCE OF SPARTA HEALTH AND REHAB from CRM OF SPARTA LLC
20
Citations on file
Rolling three-year window
3
Life Safety surveys
In the same window
3
Tags cited more than once
Across separate surveys
10
Inspection & testing records
Of the citations on file

Position within GA

20 citations — more than 90% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated

Slippingmore citations at the latest survey than at its earlier surveys in the window.

The latest survey found 8 citations; the earlier surveys in the window averaged 6. With 3 surveys on file this is a direction of travel, not a conclusion.

When is the next survey likely?

The window opens February 2027 — about 5 months from now. This facility’s last Life Safety survey was December 2025. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.

A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured

Get an email about Woods at Sparta of Journey LLC, The

One email when it happens. No account; stop it any time with one click.

Which alerts

1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.

Emergency preparedness

2 of the 20 citations on file are Emergency Preparedness E-tags. E-tags are cited under 42 CFR §483.73 and concern the emergency plan, training, drills, communications and supplies. Nationally about half of certified facilities have at least one. The Emergency Preparedness Index

Physical environment (health survey)

3 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 20 Life Safety citations above. The Physical Environment Index

  • F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
  • F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
  • F-0880 Provide and implement an infection prevention and control program.

How that compares

Citations on file over three years

Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.

This facility20GA median8National median11
Citations on file over three years, compared
MeasureCitations
This facility20
Median facility in GA8
Median facility nationally11

Survey history

Citations at each Life Safety survey
12023-07112024-0882025-12
Citations at each Life Safety survey
Survey dateCitations
July 27, 20231
August 11, 202411
December 11, 20258

Most-cited tags

Most-cited tags at this facility
K-03723E-00042K-03112K-03411K-05111K-03741K-02111K-02911
Most-cited tags at this facility
TagWhat the surveyor checksTimes citedLast cited
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.32025-12-11
E-0004Develop and maintain an Emergency Preparedness Program (EP).22025-12-11
K-0311Have an enclosure around a vertical opening shaft.22025-12-11
K-0341Install a fire alarm system that can be heard throughout the facility.12024-08-11
K-0511Have properly installed electrical wiring and gas equipment.12025-12-11
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.12024-08-11
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.12024-08-11
K-0291Install emergency lighting that can last at least 1 1/2 hours.12024-08-11

What the citations cover

Citations by CMS category
  • Smoke Deficiencies 10
  • Miscellaneous Deficiencies 3
  • Egress Deficiencies 2
  • Emergency Preparedness Deficiencies 2
  • Other 3
Citations by CMS category
CategoryCitations
Smoke Deficiencies10
Miscellaneous Deficiencies3
Egress Deficiencies2
Emergency Preparedness Deficiencies2
Gas, Vacuum, and Electrical Systems Deficiencies2
Services Deficiencies1

Every citation on file

As published by CMS, newest survey first. Descriptions are CMS’s own wording.

December 11, 2025 — 8 citations

Citations issued on December 11, 2025
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (January 25, 2026)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (January 25, 2026)
K-0345Have approved installation, maintenance and testing program for fire alarm systems.Deficient, Provider has date of correction (February 27, 2026)
K-0363Install corridor and hallway doors that block smoke.Deficient, Provider has date of correction (January 25, 2026)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (February 27, 2026)
K-0511Have properly installed electrical wiring and gas equipment.Deficient, Provider has date of correction (January 25, 2026)
K-0741Have posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking was allowed.Deficient, Provider has date of correction (January 25, 2026)
K-0911Meet requirements for the installation and maintenance of electrical systems.Deficient, Provider has date of correction (January 25, 2026)

August 11, 2024 — 11 citations

Citations issued on August 11, 2024
TagWhat the surveyor checksStatus
E-0004Develop and maintain an Emergency Preparedness Program (EP).Deficient, Provider has date of correction (September 7, 2024)
K-0211Keep aisles, corridors, and exits free of obstruction in case of emergency.Deficient, Provider has date of correction (September 7, 2024)
K-0291Install emergency lighting that can last at least 1 1/2 hours.Deficient, Provider has date of correction (September 7, 2024)
K-0311Have an enclosure around a vertical opening shaft.Deficient, Provider has date of correction (September 7, 2024)
K-0324Provide properly protected cooking facilities.Deficient, Provider has date of correction (September 7, 2024)
K-0341Install a fire alarm system that can be heard throughout the facility.Deficient, Provider has date of correction (September 7, 2024)
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (September 7, 2024)
K-0374Install smoke barrier doors that can resist smoke for at least 20 minutes.Deficient, Provider has date of correction (September 7, 2024)
K-0712Have simulated fire drills held at unexpected times.Deficient, Provider has date of correction (September 7, 2024)
K-0761To conduct inspection, testing and maintenance of fire doors by qualified individuals.Deficient, Provider has date of correction (September 7, 2024)
K-0920Ensure proper usage of power strips and extension cords.Deficient, Provider has date of correction (September 7, 2024)

July 27, 2023 — 1 citation

Citations issued on July 27, 2023
TagWhat the surveyor checksStatus
K-0372Ensure smoke barriers are constructed to a 1 hour fire resistance rating.Deficient, Provider has date of correction (September 10, 2023)

Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.