Federal nursing home survey record · CMS-certified nursing home· Not a state assisted-living licensing record
Brown's Health and Rehabilitation
STATESBORO, GA · 63 certified beds · Last Life Safety survey January 11, 2026
CMS Certification Number 115604 · first certified June 1996
Ownership
Operated by BRIGHTON HEALTHCARE · For profit - Limited Liability company
- New ownershipOwnership changed May 1, 2025 (change of ownership)from BN SNF LLC
Position within GA
7 citations — more than 40% of the 356 certified nursing homes in GA. Compared within GA rather than nationally because which state a facility is in explains about 30% of the variation in citation counts between facilities, while bed count explains under 1%. State survey agencies differ far more than the buildings do. How this is calculated
The latest survey found 2 citations; the earlier surveys in the window averaged 2.5. With 3 surveys on file this is a direction of travel, not a conclusion.
When is the next survey likely?
The window opens March 2027 — about 6 months from now. This facility’s last Life Safety survey was January 2026. Facilities in GA are typically surveyed 14–20 months after the last one (median 16), measured over 532 consecutive surveys in the last two years of CMS records.
A range the record supports, not a prediction of a date. State agencies vary widely — from about 11 months in Pennsylvania to three years in Maryland. How the window is measured
Get an email about Brown's Health and Rehabilitation
One email when it happens. No account; stop it any time with one click.
1 inspection-and-testing tag has been cited here at more than one survey. Nationally, that pattern is common: about three quarters of cited facilities have at least one repeated tag, and half of the facilities ever cited for sprinkler inspection and testing are cited for it again. A repeat is usually a recordkeeping gap rather than a new hazard.
Physical environment (health survey)
4 physical-environment citations on the health survey. Cited by the health surveyors under Appendix PP, not the Life Safety Code surveyor: equipment in safe operating condition, the call system, bed rails, pest control, hazards, the environment. Counted separately from the 7 Life Safety citations above. The Physical Environment Index
- F-0689 Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents.
- F-0584 Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely.
- F-0880 Provide and implement an infection prevention and control program.
How that compares
Compared with the median facility in GA, and nationally. Surveyors differ markedly between states, so the GA figure is the meaningful one.
| Measure | Citations |
|---|---|
| This facility | 7 |
| Median facility in GA | 8 |
| Median facility nationally | 11 |
Survey history
| Survey date | Citations |
|---|---|
| July 17, 2022 | 0 |
| November 7, 2024 | 5 |
| January 11, 2026 | 2 |
Most-cited tags
| Tag | What the surveyor checks | Times cited | Last cited |
|---|---|---|---|
| K-0511 | Have properly installed electrical wiring and gas equipment. | 2 | 2026-01-11 |
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | 1 | 2024-11-07 |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | 1 | 2024-11-07 |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | 1 | 2024-11-07 |
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | 1 | 2026-01-11 |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | 1 | 2024-11-07 |
What the citations cover
- Smoke Deficiencies 3
- Services Deficiencies 2
- Egress Deficiencies 2
| Category | Citations |
|---|---|
| Smoke Deficiencies | 3 |
| Services Deficiencies | 2 |
| Egress Deficiencies | 2 |
Every citation on file
As published by CMS, newest survey first. Descriptions are CMS’s own wording.
January 11, 2026 — 2 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0321 | Ensure that special areas are constructed so that walls can resist fire for one hour or have an approved fire extinguishing system. | Deficient, Provider has date of correction (February 16, 2026) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (February 16, 2026) |
November 7, 2024 — 5 citations
| Tag | What the surveyor checks | Status |
|---|---|---|
| K-0211 | Keep aisles, corridors, and exits free of obstruction in case of emergency. | Deficient, Provider has date of correction (December 22, 2024) |
| K-0223 | Provide exit doors that are held open by devices that will automatically close on the activation of a fire alarm or smoke detector. | Deficient, Provider has date of correction (December 22, 2024) |
| K-0353 | Inspect, test, and maintain automatic sprinkler systems. | Deficient, Provider has date of correction (December 22, 2024) |
| K-0372 | Ensure smoke barriers are constructed to a 1 hour fire resistance rating. | Deficient, Provider has date of correction (December 22, 2024) |
| K-0511 | Have properly installed electrical wiring and gas equipment. | Deficient, Provider has date of correction (December 22, 2024) |
Reflects the CMS posting of August 1, 2026. Surveys conducted in the last few months may not appear yet.